My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA Between Kittitas Co. & Accurate Electric Unlimited
>
Meetings
>
2024
>
09. September
>
2024-09-17 10:00 AM - Commissioners' Agenda
>
PSA Between Kittitas Co. & Accurate Electric Unlimited
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2024 3:37:43 PM
Creation date
10/4/2024 3:37:34 PM
Metadata
Fields
Template:
Meeting
Date
9/17/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Professional Services Agreement between Kittitas County and Accurate Electric Unlimited, Inc.
Order
5
Placement
Consent Agenda
Row ID
122274
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT ''A'' <br />SCOPE OF WORK <br />Coordin Scone: <br />AEU will provide the equipment, software, licenses, integration, and execution for <br />replacing the existing controls PLC system. The delivery method is design-build. <br />Scope of supply by AEU: <br />o Replace existing Modicon Quantum PLC (w/Advantys input/output modules) with <br />Modicon PLC and new input and output devices. <br />. Provide PLC licensing and upgrades as required. <br />o lntegrate new PLC with existing HMl. <br />. lncorporate 34 existing 2nd floor cameras to HMI/Touchscreen including adding <br />icons and integrate call-ups associated with the camera (this assumes that the <br />doors to have cameras associated already appear on existing HMI screens.) <br />. Upgrade Annex HMI station license and replace workstation computer. <br />. A separate cost can be provided for added rooftop cameras or incorporated into <br />a revision of this proposal. <br />. Provide integration to reproduce existing functions of the touch-screen control <br />system.. Provide dedicated maintenance computer for maintenance of completed system. <br />. Provide new PLC equipment in existing enclosure, utilize existing relays and <br />terminals. Replace existing power supplies within existing PLC enclosure. <br />. As-built red-line documentation of work completed. <br />. Provide electrical permit. <br />P rofession al Servi ces Ag reement (r ev . 09 I 24 I 20 1 8) <br />Page 13 of 17
The URL can be used to link to this page
Your browser does not support the video tag.