My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024 Staff Report and Docket Item Supporting Documents
>
Meetings
>
2024
>
09. September
>
2024-09-10 6:00 PM - Planning Commission
>
2024 Staff Report and Docket Item Supporting Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 2:25:00 PM
Creation date
9/5/2024 1:28:45 PM
Metadata
Fields
Template:
Meeting
Date
9/10/2024
Meeting title
Planning Commission
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2024-04 <br /> 16.12.110 Required easements. <br /> All lots will have utility easements shown on the face of the plat or in the plat restrictions. Said <br /> easements shall be of a width adequate to allow for future utility installations. <br /> 1. Drainage and Storm Water Easements. Easement for drainage channels and ways shall <br /> be of sufficient width to assure that the same may be maintained and improved. <br /> Easements for storm water shall be provided and shall be 10 feet in width and properly <br /> located to permit future installations. No storm water discharge to irrigation entity <br /> facilities shall be authorized without a permit from the irrigation entity or ditch owner. <br /> 2. Utility Installations. Utility lines, including, but not limited to electricity,water, natural <br /> gas, sewer, telephone and television cable, serving and located within the subdivision, <br /> shall be placed underground.Where topography, soil, or other conditions make <br /> underground installations impracticable, and the board, upon recommendation from the <br /> county engineer, so finds upon written evidence presented by the supplier of such <br /> utilities, may waive this requirement for underground utilities. Utility installations shall <br /> be in conformance with requirements of KCC Tit, (Utilities within the right of way). <br /> 3. Public Utilities.Where alleys are not provided, easements for public utilities shall be <br /> provided along lot lines where necessary, including any necessary access easements. <br /> There shall be a minimum of ten (10) feet in width. Where possible,the width of rear <br /> and side lot line easements shall be equally shared by abutting lots and easements shall <br /> be continuous and aligned from block to block within the subdivision and with adjoining <br /> subdivisions. <br /> 4. Irrigation Easements.Any plat which includes a lot or lots consisting, in whole or in part, <br /> of irrigated land, or un-irrigated land classified by an irrigation district as irrigable to <br /> which there is a water right, shall provide adequate irrigation easements to each such <br /> lot.Any plat proposed for land through which irrigation water flows to downstream <br /> users shall provide easements for existing ditches, channels, conveyances and structures <br /> through which such water flows and such shall be shown on the plats, maps and <br /> pelyester originals_plans. <br /> All easements and rights of way required pursuant to this subsection shall be of sufficient width for <br /> maintenance, and the plat shall contain on its face a note of access to downstream water users for <br /> the purpose of maintenance. Easements shall be labeled as "existing," herein dedicated," or"created <br /> via separate document." In the event that the first or third options are used the recording number <br /> shall be shown on the map.All easements shall also include width and purpose of easement on the <br /> face of the map. Preliminary applications for the division of land shall conform to <br /> stormwater regulations and stormwater easements shall be shown prior to final approval of the <br /> document. <br /> Any new easement necessary for Irrigation and delivery of water shall be reviewed by the Irrigation <br /> district or entity serving the site to make recommendations as to the final location and placement of <br /> new easements. It is recognized that the preference is to place new easements outside any existing <br /> right of way and the County road.Additional easement width may be required to accommodate the <br /> delivery or tail water. Existing irrigation conveyances within the County road right of way shall <br /> continue to exist under the Right to Farm Ordinance within this code. <br />
The URL can be used to link to this page
Your browser does not support the video tag.