My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AIA 101 Agreement 08302024
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
AIA 101 Agreement 08302024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2024 9:02:50 AM
Creation date
9/3/2024 8:43:00 AM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Notes
Lower Valley TS Contract signed by contractor
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.4 will coordinate the installation of the accepted substitute, making such <br />changes as may be required for the work to be complete in all respects. <br />3.4.2.3 Submit request for substitution utilizing the Substitution Request Form located <br />in Section 0125 00. <br />3.4.4 After the Contract has been executed, the Owner and the Architect will <br />consider a formal request for the substitution of products in place of those <br />specified only under the conditions set forth in the General Requirements <br />(Division 1 of the Specifications). <br />3.4.5 By making requests for Substitutions based on Subparagraph 3.4.3 above, the <br />Contractor: <br />.1 represents that the Contractor has personally investigated the proposed <br />substitute product and determined that it is equal or superior in all respects to <br />that specified; <br />2 represents that the Contractor will provide the same warranty for the <br />substitution that the Contractor would for that specified; <br />.3 certifies that the cost data presented is complete and includes all related costs <br />under this Contract except the Architect's redesign costs, and waives all claims for <br />additional costs related to the substitution which subsequently become apparent; <br />and <br />.4 will coordinate the installation of the accepted substitute, making such changes <br />as may be required for the Work to be complete in all respects. <br />3.5 WARRANTY <br />3.5.1 REVISE the sentence "Work, materials or equipment not conforming to these requirements, may be <br />considered defective." to read as follows: <br />Work not conforming to these requirements, including substitutions not properly approved <br />and authorized, shall be considered defective. <br />3.5.1 DELETE the phrase "If required by the Architect" from the last sentence so that it reads: The Contractor <br />shall furnish satisfactory evidence as to the kind and quality of materials and equipment. <br />3.5.1 Add the following sentence to the end of Subparagraph 3.5.1: <br />The Contractor shall maintain such warranty for a period of one (1) year from the date of Substantial <br />Completion of the project not withstanding more extensive warranty requirements specified for certain <br />elements and products used in the work in which case the longer warranty requirement shall apply. <br />TAXES: ADD the following to Paragraph 3.6.1: <br />The contract sum and any agreed variations thereof shall include all taxes imposed by law, and properly <br />chargeable to the project except Sales Tax. Sales Tax applicable to the contract sum will be collected from the <br />Owner and shall be paid to the State Department of Revenue by the Contractor in conformance with the law. <br />State of Washington Sales Tax shall not be included in the bid price, except that the retail sales tax upon sales <br />and rentals to prime contractors and subcontractors of tools, machinery and equipment, and consumable <br />supplies, such as hand and machine tools, cranes, air compressors, bulldozers, lubricating oil, sandpaper and <br />form lumber which are primarily for use by the Contractor rather than for resale as a component part of the <br />Kittitas County — Lower Valley 4 of 24 Supplementary General <br />Transfer Station Conditions of the Contract <br />June 18. 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.