My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AIA 101 Agreement 08302024
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
AIA 101 Agreement 08302024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2024 9:02:50 AM
Creation date
9/3/2024 8:43:00 AM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Notes
Lower Valley TS Contract signed by contractor
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY — LOWER VALLEY TRANSFER STATION <br />ADDENDUM NO.4 <br />JULY 29, 2024 <br />The above -referenced Contract Documents shall be amended as indicated in detail below. One signed <br />copy of the Certification page shall be included with the bid. The inclusion of this Addendum will be <br />noted in the Agreement, and the execution of the Contract shall indicate full acceptance by all parties of <br />the provisions contained herein. All other provisions of the Plans, Specifications, and other Contract <br />Documents not noted in the Addendum shall remain unchanged and in full effect. This Addendum shall <br />be attached to and become a part of the Plans and Specifications for the project. <br />Addendum <br />Document <br />Section, <br />Description of Change <br />Item <br />Page <br />Number, or <br />Sheet <br />4.01 <br />Response to <br />-- <br />Response to RFI Questions List is hereby added and <br />RFI Questions <br />included in the contract documents. <br />List <br />4.02 <br />Bid Due Date <br />-- <br />Change Bid Due Date to August 2, 2024 at 10:00 AM <br />Pacific Time Zone on the <br />INVITATION TO BID document. <br />Revised excel spreadsheet provided to contractors. <br />4.03 <br />Revised Bid <br />Attached is the revised Bid Schedule. Contractor must use <br />Schedule <br />Addendum No 4 Bid Schedule with its bid. <br />Four(4) Bid quantities revised. <br />Bid Item 5 — Clear and Grub — increased bid quantity to 30 <br />acres. <br />Bid Item 8 — Geotextiles- Increased Bid Qty to 55,400 SY. <br />Bid Item No. 17 — Site Fencing - 6' High Chainlink- <br />increased bid quantity to 3,975 LF. <br />Bid Item No. 18 — Site Fencing — Gates- reduced bid <br />quantity to: 8 ea. <br />Gates shall be installed at the following locations: <br />Four (4) —10' Wide Gates at main entrance. <br />Two (2) — 10' Wide Gates along Hwy 97 at temporary <br />construction entrance <br />Two (2) —12' Wide gates at Northwest corner of site. <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.