My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AIA 101 Agreement 08302024
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
AIA 101 Agreement 08302024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2024 9:02:50 AM
Creation date
9/3/2024 8:43:00 AM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Notes
Lower Valley TS Contract signed by contractor
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part 3.2.1-1 — Delete the outbound <br />unattended enclosure note. <br />2.06 <br />Hot Mixed Asphalt <br />5-04 <br />Add Special Document No. 2 — Hot Mix <br />Special Specification <br />Asphalt Special Specifications to the <br />Special Document Section located after <br />Technical Specifications. <br />2.07 <br />Civil Site Details Sheet <br />Sheet C18 <br />Add note under "Scale installation <br />C18 <br />Notes" in Detail Section A/C18: <br />THE CONTRACTOR SHALL COORDINATE <br />THE LOCATION OF THE SCALEHOUSE <br />TRANSACTION WINDOW AND THE <br />EDGE OF THE SCALE. THE SPACING <br />BETWEEN THE WINDOW AND EDGE OF <br />THE SCALE WILL BE A MAXIMUM OF 18 <br />INCHES. <br />2.08 <br />Specification 07 13 26 <br />07 13 26 <br />Change: 2.01.A2b to read "GCP <br />Bituthene 4000". <br />2.09 <br />Specification 07 22 70 <br />07 22 70 <br />Delete Specification 07 22 70 — Roof <br />Anchor Posts. <br />2.10 <br />Specification 07 25 00 <br />07 25 00 <br />In Specification 07 25 00 — Weather <br />Barriers, change Part 2.1.131a to read <br />"GCP Perm A Barrier VPS 30". <br />2.11 <br />Specification 081100 <br />081100 <br />Specification 08 1100 - Storefront is <br />added to Addendum No. 2. <br />2.12 <br />Specification 10 26 01 <br />10 26 01 <br />Delete Specification 10 26 01 — Wall <br />and Corner Guards. <br />2.13 <br />Specification 10 75 00 <br />10 75 00 <br />Delete Specification 10 75 00 — <br />Flagpoles. <br />2.14 <br />Door Hardware <br />-- <br />The exit device substitution <br />Substitution <br />(Dormakaba Precision 2000 Series) is <br />approved; however, the door closer <br />substitution (Dormakaba QDC100 <br />Series) is rejected. <br />2.15 <br />Hard-Cem Substitution <br />The structural engineer has no <br />exception to the Hard-Cem Integral <br />Hardening Admixture for concrete <br />finish. <br />2.16 <br />Hi -Tech PE90 <br />The structural engineer has no <br />Substitution <br />exception to the Hi -Tech PE90 <br />substitution request for joint filler. <br />END OF ADDENDUM NO. 2 <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.