My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AIA 101 Agreement 08302024
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
AIA 101 Agreement 08302024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2024 9:02:50 AM
Creation date
9/3/2024 8:43:00 AM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Notes
Lower Valley TS Contract signed by contractor
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT NUMBER: TEST PIT NUMBER: <br />684127CH.05.02 TP-25 P SHEET 1 OF 1 <br />jr <br />4A 4A? <br />M�Mo <br />TEST PIT LOG <br />PROJECT: Kittitas County Transfer Station Kittitas County WA LOCATION: Biofilter (613924.0 N 1617653.6 E) <br />ELEVATION: 1551.3 ft NAVD88 CONTRACTOR: C. Van De Venter/Kittitas Co. <br />EXCAVATION EQUIPMENT: Hitachi Zaxis 135US Excavator w/ 30" bucket DATE EXCAVATED: 4/9/2019 <br />%AIATFR I M/M C• R n ft kn APPROX. DIMENSIONS: 3 wide 10' lono LOGGER: M. Kacmarcik <br />SAMPLE <br />SOIL DESCRIPTION <br />COMMENT <br />LL <br />(D <br />DIFFICULTY IN EXCAVATION, <br />= 3 w <br />u <br />w <br />SOIL NAME, USCS GROUP SYMBOL, COLOR, <br />o <br />RUNNING GRAVEL CONDITION, <br />a o � <br />> <br />°' <br />MOISTURE CONTENT, RELATIVE DENSITY OR <br />COLLAPSE OF WALLS, SAND HEAVE, <br />o m � <br />w <br />u <br />CONSISTENCY, SOIL STRUCTURE, MINERALOGY <br />a <br />DEBRIS ENCOUNTERED, WATER <br />I- <br />SEEPAGE GRADATIONAL CONTACTS, <br />V) <br />z <br />Begin TP excavation at 14:23. Ground surface is <br />Clayey : orange -brown with grey mottling, moist, medium <br />plasticity. <br />grass pasture. Weather is clear and windy. — <br />1.0 <br />1-BULK <br />LABORATORY: <br />w(%)=19.9 _ <br />LL=38%, PL=21%, PI=17% <br />2.0 <br />P200=44.0% <br />_ <br />Volcanic ash layer at 2.5' bgs, approx 2" thick <br />Sandy SILT (ML): Similar to above with estimated 30% fine to medium <br />sand. <br />5 <br />_ <br />No sidewall sloughing in silt <br />Well -Graded Cobbley GRAVEL (GW): brown, moist. Rounded gravels <br />to 8 inch diameter. <br />see** <br />••••• <br />7.0 <br />2-BULK••••• <br />••••• <br />— <br />LABORATORY: <br />• • • • <br />P200=6.2% <br />• • • • • <br />Groundwater at 8.0' bgs. Install 1" diameter <br />&0 <br />• • • • <br />Schedule 40 PVC piezometer in test pit with field <br />sees* <br />••••• <br />slotted screen from 8.0 to 9.0' bgs. <br />10 <br />••••• <br />Backfill to ground surface with compacted <br />Bottom of Boring at 11.0 ft bgs on 4/9/2019 <br />excavation spoils. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.