My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AIA 101 Agreement 08302024
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
AIA 101 Agreement 08302024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2024 9:02:50 AM
Creation date
9/3/2024 8:43:00 AM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Notes
Lower Valley TS Contract signed by contractor
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 13, 2023 <br />HWA Project No. 2022-188-21 <br />Table 1: Ground Motion Values, Site Class C* <br />Mapped MCE <br />Adjusted MICE <br />Period <br />Spectral <br />Site <br />Spectral <br />Design Spectral <br />(sec) <br />Response <br />Coefficients <br />Response <br />Response <br />Acceleration <br />Acceleration (g) <br />Acceleration (g) <br />0.0 <br />PGA <br />0.225 <br />FPGA <br />1.200 <br />PGAM <br />0.270 <br />- <br />- <br />0.2 <br />S, <br />0.512 <br />Fa <br />1.295 <br />sm, <br />0.663 <br />SDI <br />0.442 <br />1.0 <br />Sr <br />0.208 <br />F, <br />1.500 <br />SMI <br />0.312 <br />Sw <br />0.208 <br />Transition <br />Point <br />Period <br />(sec) <br />To <br />0.094 <br />Ts <br />0.470 <br />IL—TL <br />16 <br />Notes. *2% Probability of Exceedance in 50 years for Latitude 47.0151 ° and Longitude-120.5912° <br />PGA = Peak ground acceleration <br />FPGA = PGA site coefficient <br />PGAM = Maximum considered earthquake geometric mean peak ground acceleration adjusted for Site Class effects <br />Ss = Short period (0.2 second) Mapped Spectral Acceleration <br />Si = 1.0 second period Mapped Spectral Acceleration <br />SMs = Spectral Response adjusted for site class effects for short period = Fa • Ss <br />SM) = Spectral Response adjusted for site class effects for I -second period = F • S) <br />SIDS = Design Spectral Response Acceleration for short period =2/3 • SMs <br />SDI = Design Spectral Response Acceleration for 1-second period =2/3 • SMi <br />F,1 = Short Period Site Coefficients <br />F = Long Period Site Coefficients <br />To= 0.2•SDI/SDs <br />T, = SDI/SDs <br />TIL = Long Period Transition period <br />Based on Tables 11.6-1 and 11.6-2 (of ASCE 7-16), the Seismic Design Category for the site is <br />«D„ <br />4.3 LIQUEFACTION POTENTIAL <br />The native fine-grained and coarse -grained alluvial deposits that underlie the project site are <br />either moderately to highly plastic or dense to very dense and are not generally susceptible to soil <br />liquefaction. Based on this HWA considered the site soil to have a low susceptibility to soil <br />liquefaction. <br />4.4 FOUNDATIONS <br />We recommend that foundations for the transfer station, the MRW building, the administration <br />building, and the scale facility be supported on spread footings founded on the underlying <br />medium dense to dense, coarse -grained alluvium, or properly compacted structural fill placed <br />directly on native coarse -grained soils. The following sections provide our recommendations for <br />design and construction of the foundations. <br />2022-188-21 KCTS — Final Geotechnical Report 9 HWA GEOSCIENCES INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.