Laserfiche WebLink
June 1 ?. 2023 <br />H WA Project No. 2022- l tilt-21 <br />SCS Engineers, Inc. <br />2405 Isn't' Avenue, Suite 107 <br />Bellvvue, WA 09005 <br />\11C11tii+n Iorn Parker, P.E. <br />Suhjccl: FIN %L CF.O'1'ECIItiw-m. Rh.11014T <br />Kittita►s ('aunt)' Transfer Station ProJect <br />Ellenshurg, \1 asltsnt;tou <br />Dear Tom, <br />As authorized.. HWA G oSciences Inc. I I iNVA) has undertaken a g,coteclinicaI invest igtttIt, n I',I <br />the proposed new irunster station in Ellensburg, Kitlitas Counly. Washington. Tho atlached until <br />report summarizes the rt Suits ol'our geoteclinicul investigation and proN ides our geotechnical <br />recommendations iM doign and constructic,n of thc nov facilities. Please review and comment <br />,d ytxn• earliest convenience. <br />We appreciate the opportunity to provide geotechntcal services on ibis projicct. <br />ineerely. <br />FINVA CEOSCIt WTS INC. <br />Sire)» E. Greene. L.E.G, <br />Senior Ejngincering Geologist <br />S1.(i:Jl (+.sq <br />JoLyn Gillie P.E. <br />GeotcOmical Engineer. Principal <br />