Laserfiche WebLink
PREREQT'ISITES <br />Owner agrees to furnish:o IP addresses for the carneraso Rackspace for patch panel. <br />EXCLUSIONSo Asbestos tbsting or abatement.o painting. <br />CI,ARIFICATIONSr Nothing is included which is not specilied in this proposal. <br />cosT <br />The above is offered fior $52,1 1 1.0O. This cost is valid for 30 days from the date of <br />this document. After 30 days please contact AEU's office for updated cost. <br />Billings will occur monthly, see below for details. AEU witl furnish a schedule of <br />values based on AIA format. <br />Please feelfree to contact me with any questions. You may reach me by email @ <br />lohn@aeulnc.com, on my office phoni (360) 567-3330, or on my cell at (360) ZgS+540. <br />tf you accept thls proposal and authorize wort to begin, please <br />slgn, date and emall or fax to 360€67-3320 tor counteelgnaturc. <br />Signature of authorired representative for the buyer: <br />&ictert$eCIe; <br />POs <br />Please Note. <br />This ofier is valid for ('10) days from tre date of this dmumenl unless noted othenvise above. Please note. No energized eleclrical work is <br />included. This wod( b to be provided during normal operating trcurs. This ofrer is predbated upon the exeq.rtion of a mutualty negotiated <br />contrad and pmjecl schedule induding, at the minimum, tlp attrachment of lhis proposal as a contrac{ exhibil. <br />Projecl was bid wilhotn irrlusicns for disruption of con$nual work frorn start to finish. A rernobilization fee will be cfiarged it cre$/s are unable to <br />continue progress fiom irrcuned dbruptiors in r,uork or access to the work area. When cornplete projed inlormation is made availade then an <br />altemate construction and payment method shall be renegotiated and agreed upon beforo work commences. <br />Exdusiors- <br />Nothing is irrcluded that is not specified irrcluding: code conec{iors lo exbting electbal, changes required by AHJ, Washingrlon State sales <br />tax, light pole base engineering, seismic, fire alarm, seflrity, burglar alarm, video surveillarrce, card access, Covid 19 related delay or <br />schedule impact, sheetroc* ortting/patching/paintir€ of any kind, ceiling wires or slack wires, final deaning, temporary lighting, temporary <br />pot!€r, concrete sawcuttrng, poudns, patcfrins, flat work, bdlards, core drilling, underground excavation, boring, or backfill, vac truck, raceway <br />cleaning, rffireay proofing, fire sealirg, rmf penetrations, fire caulkirg. or Poarer, Cornmunications, and Tele data tXility fees included i.e.., <br />aid to construction and systems developmenl. <br />Escalation- <br />This budget proposal is conditioned upon lh€ ability to cornplete the premis€s at pres€nt prir:es for materials and equipnpnt. lf AEU is unade <br />to comdete the abov+described project al cunent pricas for matedals and equiprnent, the @ntracl sum shall be eguitady adjusted to <br />compersate for irrreased csts. A dnrge in price of an item of rnaterial or equipment will be onsirlered significant wtren lhe price increases <br />15olo between the date of this budget and the dale of ltn applicable work. <br />Sincerely, <br />, /ohw {autgtin <br />Estimator