Laserfiche WebLink
Dept. of Public Works <br />Page4 <br />2.7 Individuals on the hangar wait list who are offered an available <br />hangar will have 14 calendar days to notifii Public Works of their <br />intent to accept or decline the hangar. Individuals which choose to <br />decline the available hangar will be placed at the end of the hangar <br />wait list. <br />2.8 Once an individual is approved to lease a County owned T-Hangar <br />and accepts the terms of the rental agreement, their name will be <br />removed from the list. <br />2.9 A wait list has previously been in place prior to adoption <br />of this policy. Within three weeks of policy adoption, the Public <br />Works Office will contact individuals on the current wait list and <br />provide them with 14 calendar days to respond with a new application <br />and deposit to keep their place on the new T-Hangar wait list. <br />411 N. Ruby, Suite #1 <br />Ellensburg, WA 98926 <br />TEL <br />FAX <br />(509) 962-7523 <br />(509) 962-7663