My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 2
>
Meetings
>
2024
>
08. August
>
2024-08-06 10:00 AM - Commissioners' Agenda
>
Amendment No. 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2024 12:39:38 PM
Creation date
8/21/2024 12:39:31 PM
Metadata
Fields
Template:
Meeting
Date
8/6/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Amendment No.2 to a Professional Service Agreement with Parametrix
Order
3
Placement
Consent Agenda
Row ID
120774
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parametrik Scope of Worlc <br />r Update of proposed final fill <br />. Update life-cycle analysis <br />r Update closure and post{losure cost estimates <br />e TeK edits to clariry unclear portions of the 2024 plan <br />r Description of the potential for a partial closure of portions of the landfill that have reached <br />grade <br />. Fill map with clear coordinates for the top of refuse <br />. Clarification of the stormwater ditch locatisns <br />o Permit submiftal of the 90% Plans, Specifications and Cost Estimate for the closure of the <br />LPL <br />e Permit submittal of the 9O% Construction Quality Assurance Plan <br />o Multiple meetings with the regulators to determine what they were looking for in the closure <br />documentation <br />The only work assumed to be remaining in the task is coordination with the County, Ecology, and the <br />Department of Health to clarifu that the updates to the Closure/Post-Closure Plan were within the <br />scope of the WAC and did not modify the substance of the existing, permitted plan. <br />Ilssurnptlons <br />r The assumptions for this task include: <br />o No further design work will be completed under this task <br />o Additional requests beyond the budget of this task will be covered under Task O8 * <br />Unanticipated Cducal Work <br />o No additional calculations or writeups are needed under thls task <br />Ilellverable <br />a Letter explainingthe updates to the Limited Purpose Landfill (LPL) Closure/Post-Closure Plan <br />for Health <br />S'asl< 03 - &PS, Closure HnEineering $erviees {Closed} <br />This task is closed. Construction will not occur during this amendment period. <br />Taslq 04 - Hvaluatf.on of, Borrow $oi.3,s for Other trIses <br />Majonty of this work has been completed. Additionaltasksthat were completed include: <br />Ki&itas County Solld Waste <br />ftyegrass LPI and Futqre Lb6 <br />Amendment02 <br />2 <br />5531763010 <br />June2024
The URL can be used to link to this page
Your browser does not support the video tag.