My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_CRP 321.24_ No.6 Road
>
Meetings
>
2024
>
08. August
>
2024-08-20 10:00 AM - Commissioners' Agenda
>
Resolution_CRP 321.24_ No.6 Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2024 12:09:22 PM
Creation date
8/15/2024 12:08:51 PM
Metadata
Fields
Template:
Meeting
Date
8/20/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Initiating County Road Project Designated as CRP No. 321-24, No. 6 Road Improvements
Order
10
Placement
Consent Agenda
Row ID
121365
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. <br />BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter <br />of initiating a county road project designated as: <br />CRP NO: 321-24 JOB NO: RC 2300 <br />The project will include of the replacement of the existing pavement to repair failing pavement sections, widening the <br />travel lanes to 12-foot lanes with 2-foot shoulders, and addressing roadside safety elements including the addition of <br />guardrail and removal of hazards in the clear zone from milepost 0.00 to 3.58. <br />ARTERIAL <br />ACCESS <br />This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and <br />proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). <br />IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County <br />Engineers estimate, is hereby made in the amounts and for the purposes shown: <br />PURPOSE <br />AMOUNT <br />TOTALS <br />PRELMINARY ENGINEERING <br />$ 250,000 <br />CONSTRUCTION ENGINEERING <br />$ 60,000 <br />RIGHT-OF-WAY ACQUISITION <br />$ <br />SUB -TOTAL <br />$ 310,000 <br />Is <br />County Forces CONSTRUCTION <br />$ <br />CONTRACT CONSTRUCTION <br />$ 1,140,000 <br />SUB -TOTAL <br />1,140,000 <br />TOTAL PROJECT COST <br />$ 1,450,000 <br />GRANT OR OTHER FUNDS <br />$ 1,305,000 <br />Grant Source: STBG A <br />TOTAL COUNTY ROAD FUND ALLOCATION <br />$ 145,000 <br />Cameron Curtis, P.E. <br />County Engineer <br />❑ THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2023 ANNUAL ROAD PROGRAM AS <br />ITEM NO. <br />® THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN <br />ACCORDANCE WITH RCW 36.81.130 <br />IT IS FURTHER RESOLVED THAT: <br />® THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ. <br />❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND <br />WAC 136-18. ---� <br />Attest: <br />ADOPTED this 20th day of August, 2024. <br />BOARD OF COUNTY COMMISSIONERS ® Clerk of the Board <br />KITTITAS COUNTY, WASHINGTON <br />Brett Wachsmith, Chair Laura Osiadacz, Vice -Chair Cory Wright, Commissioner <br />g:\base\forms\eng\crp-frm 8/13/2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.