Laserfiche WebLink
PREREQUISITES <br />Owner agrees to furnish: <br />• IP addresses for the cameras. <br />• Rackspace for patch panel. <br />EXCLUSIONS <br />Asbestos testing or abatement. <br />Painting. <br />CLARIFICATIONS <br />• Nothing is included which is not specified in this proposal. <br />COST <br />The above is offered for $52,111.00. This cost is valid for 30 days from the date of <br />this document. After 30 days please contact AEU's office for updated cost. <br />Billings will occur monthly, see below for details. AEU will furnish a schedule of <br />values based on AIA format. <br />Please feel free to contact me with any questions. You may reach me by email @ <br />lonnA-aeuinc.com, on my office <br />Sincerely, <br />_ f0;lw LDtiw <br />Estimator <br />pnone (jou) obi-3s:w, or on my cell at (3(j0) 7US-5546. <br />If you accept this proposal and authorize work to begin, please <br />sign, date and email or fax to 360-67-3320 for countersignature. <br />Signature of authorized representative for the buyer. <br />Printed Name: <br />pale: <br />PO #: <br />Please This offer offer is valid for (10) days from the date of this document unless noted otherwise above. Please note. No energized electrical work is <br />included. This work is to be provided during normal operating hours. This offer is predicated upon the execution of a mutually negotiated <br />contrad and project schedule including, at the minimum, the attachment of this proposal as a contract exhibit. <br />Project was bid without inclusions for disruption of continual work from start to finish. A remobil nation fee will be charged if crews are unable to <br />continue progress from incurred disruptions in work or access to the work area. When complete project information is made available then an <br />alternate construction and payment method shall be renegotiated and agreed upon before work commences. <br />Exclusio>s <br />Nothing is included that Is not specfied including: code corrections to existing electrical, changes required by AFU, Washington State sales <br />tax, light pole base engineering, seismic, fire alarm, security, burglar alarm, video surveillance, card access, Covid 19 related delay or <br />schedule impact sheetrock auttinglpatching/painting of any kind, ceding wires or slack wires, final cleaning, temporary fighting, temporary <br />power, concrete saw -cutting, pouring, patching, flat work, bollards, core drilling, underground excavation, boring, or baddll, vac truck, raceway <br />cleaning, raceway proofing, fire seating, roof penetrations, fire caulking, or Power, Communications, and Tele data Utility fees included i.e.., <br />aid to construction and systems development. <br />EE <br />This budget proposal is conditioned upon the ability to complete the premises at present prices for materials and equipment. If AEU is unable <br />to complete fhe above -described project at cunent prices for material and equipment, the contrad sum shall be equitably adjusted to <br />compensate for increased costs. A change in price of an item of material or equipment will be considered significant when the price increases <br />15% between the date of this budget and the date of the applicable work. <br />