My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SH24-010 PSA 08-20-24
>
Meetings
>
2024
>
08. August
>
2024-08-20 10:00 AM - Commissioners' Agenda
>
SH24-010 PSA 08-20-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2024 12:12:23 PM
Creation date
8/15/2024 12:08:21 PM
Metadata
Fields
Template:
Meeting
Date
8/20/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve the Professional Services Agreement between Kittitas County and Accurate Electric Unlimited for Camera Replacement at the Public Health Building RFP for CCTV Camera Upgrade at Public Health
Order
6
Placement
Consent Agenda
Row ID
121365
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PREREQUISITES <br />Owner agrees to furnish: <br />• IP addresses for the cameras. <br />• Rackspace for patch panel. <br />EXCLUSIONS <br />Asbestos testing or abatement. <br />Painting. <br />CLARIFICATIONS <br />• Nothing is included which is not specified in this proposal. <br />COST <br />The above is offered for $52,111.00. This cost is valid for 30 days from the date of <br />this document. After 30 days please contact AEU's office for updated cost. <br />Billings will occur monthly, see below for details. AEU will furnish a schedule of <br />values based on AIA format. <br />Please feel free to contact me with any questions. You may reach me by email @ <br />lonnA-aeuinc.com, on my office <br />Sincerely, <br />_ f0;lw LDtiw <br />Estimator <br />pnone (jou) obi-3s:w, or on my cell at (3(j0) 7US-5546. <br />If you accept this proposal and authorize work to begin, please <br />sign, date and email or fax to 360-67-3320 for countersignature. <br />Signature of authorized representative for the buyer. <br />Printed Name: <br />pale: <br />PO #: <br />Please This offer offer is valid for (10) days from the date of this document unless noted otherwise above. Please note. No energized electrical work is <br />included. This work is to be provided during normal operating hours. This offer is predicated upon the execution of a mutually negotiated <br />contrad and project schedule including, at the minimum, the attachment of this proposal as a contract exhibit. <br />Project was bid without inclusions for disruption of continual work from start to finish. A remobil nation fee will be charged if crews are unable to <br />continue progress from incurred disruptions in work or access to the work area. When complete project information is made available then an <br />alternate construction and payment method shall be renegotiated and agreed upon before work commences. <br />Exclusio>s <br />Nothing is included that Is not specfied including: code corrections to existing electrical, changes required by AFU, Washington State sales <br />tax, light pole base engineering, seismic, fire alarm, security, burglar alarm, video surveillance, card access, Covid 19 related delay or <br />schedule impact sheetrock auttinglpatching/painting of any kind, ceding wires or slack wires, final cleaning, temporary fighting, temporary <br />power, concrete saw -cutting, pouring, patching, flat work, bollards, core drilling, underground excavation, boring, or baddll, vac truck, raceway <br />cleaning, raceway proofing, fire seating, roof penetrations, fire caulking, or Power, Communications, and Tele data Utility fees included i.e.., <br />aid to construction and systems development. <br />EE <br />This budget proposal is conditioned upon the ability to complete the premises at present prices for materials and equipment. If AEU is unable <br />to complete fhe above -described project at cunent prices for material and equipment, the contrad sum shall be equitably adjusted to <br />compensate for increased costs. A change in price of an item of material or equipment will be considered significant when the price increases <br />15% between the date of this budget and the date of the applicable work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.