My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-07-22-minutes-public-works-&-cds-study-session
>
Meetings
>
2024
>
08. August
>
2024-08-06 10:00 AM - Commissioners' Agenda
>
2024-07-22-minutes-public-works-&-cds-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 1:31:29 PM
Creation date
8/1/2024 1:14:45 PM
Metadata
Fields
Template:
Meeting
Date
8/6/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
120774
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.3 Tier 2: Targeted <br />Evaluation <br />The highest performing alternatives from the <br />Tier 1: Initial and Revised Evaluation phase <br />were advanced into the Tier 2 evaluation. <br />The purpose of this second evaluation was <br />to further explore the differences among the <br />alternatives that had relatively close scores. <br />Based on the evaluation as presented in Table <br />4-3 and Figure 4-1, three alternatives scored <br />higher than the other alternatives, but were <br />very close in their scoring: <br />• Alternative 1: 1-90 Outside Widening <br />• Alternative 2: 1-90 Median Widening <br />• Alternative 3: 1-90 Median Widening, <br />Reversible Lanes <br />CHAPTER 4: ALTERNATIVES EVALUATION CRITERIA <br />To further differentiate between these <br />alternatives, additional Evaluation Criteria <br />were used to help distinguish potential <br />differences. Since all three alternatives were <br />modifications to 1-90, WSDOT provided input <br />into the additional criteria. The additional <br />criteria used in the Tier 2 Targeted Evaluation <br />are presented in Table 4-4. <br />VOLUME I: FEASIBILITY REPORT 1-90 Corridor - Easton to Cle Elum Feasibility Study 1 63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.