My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-07-09-minutes-solid-waste-and-maintenance
>
Meetings
>
2024
>
08. August
>
2024-08-06 10:00 AM - Commissioners' Agenda
>
2024-07-09-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 1:15:54 PM
Creation date
8/1/2024 1:14:45 PM
Metadata
Fields
Template:
Meeting
Date
8/6/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
120774
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID PROPOSAL <br />BID PROPOSAL: <br />Schedule A (SITE DEVELOPMENT W.S.S.T. RULE 170 APPLIES) <br />ITEM <br />NO. <br />WSDOT <br />SPEC <br />ITEM DESCRIPTION <br />CITY. <br />UNIT <br />Unit Price <br />TOTAL <br />PREPARATION <br />1 <br />1.09 <br />MOBILIZATION <br />1 <br />L.S. <br />6 <br />2 <br />2-01 <br />CLEARING AND GRUBBING -SITE <br />1 <br />LS. <br />% <br />! X ap <br />7/ <br />3_ <br />°I 300 <br />3 <br />2-02 <br />REMOVAL OF STRUCTURES AND OBSTRUCTIONS <br />1 <br />L.S. <br />7 <br />2aa <br />REMOVE EXISTING TREE <br />12 <br />EACH <br />Zo �— <br />6 N o `� <br />� <br />�V, <br />(v0 <br />8 <br />2-o <br />REMOVING PAVEMENT <br />1.017 <br />S.Y. <br />GRADING <br />y v^� <br />f I 0 <br />9 <br />2-03 <br />ROADWAY EXCAVATION INCL HAUL <br />2.800 <br />C.Y. <br />15 <br />75 <br />C.Y. <br />10 <br />2-03 <br />EMBANKMENT COMPACTION <br />STORM SEWER <br />7700 <br />9 ( OQ <br />11 <br />7-05 <br />CATCH BASIN TYPE 1 <br />3 <br />EACH <br />SS--- <br />q_� <br />12 <br />7-04 <br />SCHEDULE ASTORM SEWER PIPE 12 IN. DAM. <br />180 <br />LF. <br />13 <br />7-la <br />STORM INTERCEPTOR STC 1200 <br />1 <br />EACH <br />D�� <br />U� <br />Z- <br />60 <br />LF. <br />q <br />14 <br />7-xa <br />INFILTRATION TRENCH <br />WATER LINES <br />15 <br />7-15 <br />SERVICE CONNECTION 1 IN. DIAM. <br />1 <br />EACH <br />" �v•r_ <br />SURFACING <br />'1 <br />_{ �J <br />Z J 06 $ 34, 628 <br />16 <br />4-04 <br />CRUSHED SURFACING BASE COURSE <br />787 <br />TON <br />17 <br />4-04 <br />CRUSHED SURFACING TOP COURSE <br />43 <br />TON, <br />d DA <br />HOT MtX ASPHALT <br />$77,964 <br />18 <br />5-04 <br />COMMERCIAL HMA <br />634 <br />TON <br />DA <br />IRRIGATION AND WATER DISTRIBUTION <br />19 <br />8-03 <br />IRRIGATION SYSTEM <br />1 <br />LS. <br />00 <br />•O�—� <br />EROSION CONTROL AND ROADSIDE PLANTING <br />20 <br />"1 <br />INLET PROTECTION <br />9 <br />EACH <br />10 <br />a `� <br />` !(�6�J•� <br />21 <br />8-01 <br />STABILIZED CONSTRUCTION ENTRANCE <br />210 <br />S.Y. <br />ZO��,j O <br />OOP` <br />Kittitas County <br />Correctional Facility Parking Lot & The North Parking Lot Charging Station Project Bid Documents <br />
The URL can be used to link to this page
Your browser does not support the video tag.