My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 _07312024
>
Meetings
>
2024
>
08. August
>
2024-08-06 10:00 AM - Commissioners' Agenda
>
Amendment No 2 _07312024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 1:11:05 PM
Creation date
8/1/2024 1:10:08 PM
Metadata
Fields
Template:
Meeting
Date
8/6/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Amendment No.2 to a Professional Service Agreement with Parametrix
Order
3
Placement
Consent Agenda
Row ID
120774
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parametrik <br />Activities <br />Scope of Work <br />Preparation and execution of a site -specific work plan for the sampling of landfill gas generated by <br />the LPL. This will include work plan development by Parametrix staff as well as correspondence with <br />Ecology to address comments prior to execution of the work plan. Execution of the sampling will be <br />performed by Parametrix with laboratory analysis of the samples performed by a third -party <br />laboratory. <br />Deliverables <br />• One draft and one final sampling work plan. <br />• Laboratory reports of gas sampling <br />Assumptions <br />• Work plan will require one instance of comments and review by Department of Ecology. <br />• Execution of work plan will occur within one 10-hour workday plus travel. <br />• Parametrix staff will execute the field work <br />• Additional analysis and modification to the NOC application will be completed under the <br />existing Task 7 scope and budget. <br />Activities <br />• Provide input regarding processes for mixing suitable borrow soils for use in the Phase 1 <br />Closure <br />• Review available information regarding borrow soils to be available from construction at the <br />new Kittitas Transfer Station. <br />• Perform one site visit to the Kittitas Transfer Station and Ryegrass LPL for observation of the <br />proposed borrow materials <br />• Estimate approximate volumes of soils in the stockpiles present at the Kittitas Transfer <br />Station on the day of the site visit <br />• Prepare a report presenting a summary of observations, estimated volumes and <br />considerations for processing of soils to be used in the Phase 1 Closure. <br />Deliverables <br />• Technical memorandum or letter presenting a summary of observations, estimated volumes, <br />and considerations for processing of soils to be used in the Phase 1 Closure <br />Kittitas County Solid Waste 553-1763-010 <br />Ryegrass LPL and Future Uses 7 June 2024 <br />Amendment 02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.