My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_WSDOT_ADSB _Agreement
>
Meetings
>
2024
>
08. August
>
2024-08-06 10:00 AM - Commissioners' Agenda
>
Resolution_WSDOT_ADSB _Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 1:10:55 PM
Creation date
8/1/2024 1:09:39 PM
Metadata
Fields
Template:
Meeting
Date
8/6/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Authorizing the Public Works Director's Signature on Agreement with Washington State Department of Transportation for Installation of ADSB at Bowers Field
Order
24
Placement
Consent Agenda
Row ID
120774
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.3 The COUNTY shall be responsible for the actual direct and related indirect costs of <br />providing electrical power and internet connectivity and repair or restoration of those services to <br />its facility. This includes the repair of these systems. <br />4. PERIOD OF PERFORMANCE <br />4.1 Subject to its other provisions, the period of performance of this Agreement shall <br />commence on August 6th, 2024, and be terminated in accordance with Section 21. <br />4.2 WSDOT shall notify the COUNTY when equipment installed needs to be removed from <br />airport property before 30 calendar days of such removal. <br />5. COMPENSATION <br />5.1 The ADSB receiver system serves the mutual interests of WSDOT and the COUNTY <br />and is being installed on a Pro Bono basis. The costs to install and operate the system are <br />borne by each party as outlined in the Statement of Work and no compensation is expected <br />between one party to another. <br />6. AMENDMENT <br />6.1 This Agreement may be amended by mutual agreement of the parties. Such <br />amendments shall not be binding unless they are in writing and signed by personnel authorized <br />to bind each of the parties. <br />7. ASSIGNMENT <br />7.1 The Work to be provided under this Agreement, and any claim arising under this <br />Agreement, is not assignable or delegable by either party in whole or in part, without the <br />express prior written consent of the other party, which consent shall not be unreasonably <br />withheld. <br />8. ASSURANCES <br />8.1 The Parties agree that all activity pursuant to this Agreement shall be in accordance with <br />all applicable federal, state, and local laws, rules, and regulations as they currently exist or as <br />amended. <br />9. RIGHT OF ENTRY <br />9.1 Each Party hereby grants to the other Party a right of entry upon the real property for <br />which the Party holds fee title as may be necessary to perform the Work required under this <br />Agreement. <br />10. CONTRACT MANAGEMENT <br />10.1 The contract manager for each of the Parties will be responsible for and may be the <br />contact person for all communications and billings regarding the performance of this Agreement. <br />Contract Manager for Bowers Field: <br />Contract Manager for WSDOT: <br />Josh Fredrickson <br />Thomas Peterson <br />Airport Manager or their designee <br />Aviation Emergency Services Program <br />Phone: 509-962-7523 <br />Manager or their designee <br />E-Mail: Josh. Fred rickson@co. kittitas.wa. us <br />Phone:360-705-7442 <br />E-Mail: peterth@wsdot.wa.gov <br />WSDOT Agreement GCB 4098 Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.