My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_Revised2024VantageHwyProspectus (2)
>
Meetings
>
2024
>
08. August
>
2024-08-06 10:00 AM - Commissioners' Agenda
>
Resolution_Revised2024VantageHwyProspectus (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 1:08:40 PM
Creation date
8/1/2024 1:07:52 PM
Metadata
Fields
Template:
Meeting
Date
8/6/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Ratifying the Chair's Signature on a Local Agency Federal Aid Project Prospectus for the 2024 Vantage Highway Paving CRP 320-24
Notes
Can we change the document title to - Request to Approve a Resolution Authorizing the Chair's Signature on the Local Agency Federal Aid Project Prospectus for the 2024 Vantage Highway Paving CRP 320-24 Changes to Action Requested on Staff Report and Resolution Whereas #1 moved (STBG) after Surface Transportation Block Grant
Order
23
Placement
Consent Agenda
Row ID
120774
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rK <br />Project Title Date <br />as County Public Works 2024 Vantage Highway Paving 7/30/2024 <br />Right_o_f Way <br />❑✓ No Right of Way Needed _ ❑ Right of Way Needed <br />*All construction required by the ❑ No Relocation ❑ Relocation Required <br />contract can be accomplished <br />within the existing right of way. <br />Utilities <br />❑✓ No utility work required <br />❑ All utility work will be completed prior to the start <br />f th t t' t act <br />Railroad <br />Z✓ No railroad work required <br />❑ All railroad work will be completed prior to the start of <br />o e cons ruc ion con r the construction contract <br />❑ All utility work will be completed incoordination ❑ All the railroad work will be completed incoordination <br />with the construction contract with the construction contract <br />Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project <br />L <br />rFAA Involvement <br />Is <br />y airport located within 3.2 kilometers I <br />Remarks <br />miles) of the <br />project? ❑ Yes ❑✓ No <br />This project has been reviewed by the legislative body of the administration agency or agencies, or it's <br />designee, and is not inconsistent with the agency's comprehensive plan for community development. <br />Agency <br />Date By <br />Mayor/Chairperson <br />DOT Form 140-101 Page 3 <br />Revised 01/2022 Previous Editions Obsolete <br />
The URL can be used to link to this page
Your browser does not support the video tag.