My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-06-25-minutes-ec-study-session
>
Meetings
>
2024
>
08. August
>
2024-08-06 10:00 AM - Commissioners' Agenda
>
2024-06-25-minutes-ec-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 1:11:30 PM
Creation date
8/1/2024 1:07:50 PM
Metadata
Fields
Template:
Meeting
Date
8/6/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
120774
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BAXTER CONSTRUCTION L.L.C. <br />2521 River Rd. <br />Yakima, WA 98902 <br />509-452-2464 Office <br />509-454-1117 Fax <br />24-0275-CUSTOM <br />Main Level <br />Main Level <br />DESCRIPTION <br />QTY REMOVE REPLACE <br />TAX <br />O&P <br />TOTAL <br />1. Single axle dump truck - per load - <br />2.00 EA 249.90 <br />0.00 <br />50.38 <br />99.96 <br />650.14 <br />including dump fees <br />2. Commercial Supervision / Project <br />25.00 HR 0.00 <br />90.94 <br />229.16 <br />454.70 <br />2,957.36 <br />Management - per hour <br />3. Boom or spider lift - 50'-60' reach <br />1.00 MO 0.00 <br />4,500.00 <br />453.60 <br />900.00 <br />5,953.60 <br />(per month) <br />4. Prevaling wage forms <br />2.00 EA 0.00 <br />100.00 <br />20.16 <br />40.00 <br />260.16 <br />Note : Intent to pay prevailing wage and affidavits of wages paid <br />Total: Main Level <br />753.30 <br />1,494.66 <br />9,721.26 <br />Grandstands <br />Height: Peaked <br />11,842.83 SF Walls <br />16,053.06 SF Ceiling <br />2., Z. <br />27,895.89 SF Walls & Ceiling <br />15,650.00 SF Floor <br />xj <br />21, r <br />1,738.89 SY Flooring <br />404.33 LF Floor Perimeter <br />407.36 LF Ceil. Perimeter <br />Missing Wall <br />300' X 28' <br />Opens into Exterior <br />DESCRIPTION <br />QTY REMOVE REPLACE <br />TAX <br />O&P <br />TOTAL <br />5. R&R Siding - tongue & groove - <br />900.00 SF 1.02 <br />6.91 <br />719.41 <br />1,427.40 <br />9,283.81 <br />pine or equal <br />Note : Square footage is for replacing siding thats rotted out all work is mainly at the <br />bottom 4 <br />feet of the walls. <br />6. Seal the walls w/latex based stain <br />11,842. SF 0.00 <br />0.96 <br />1,146.01 <br />2,273.82 <br />14,788.95 <br />blocker - one coat <br />83 <br />7. Paint the walls - two coats <br />11,842. SF 0.00 <br />1,53 <br />1,826.45 <br />3,623.90 <br />23,569.88 <br />83 <br />8. Mask and prep for paint - plastic, <br />407.36 LF 0.00 <br />2.15 <br />88.28 <br />175.16 <br />1,139.26 <br />paper, tape (per LF) <br />9. Additional cost for high wall or <br />5,921.00 SF 0.00 <br />0.15 <br />89.52 <br />177.64 <br />1,155.31 <br />ceiling - Over 14' <br />10. Clean with pressure/chemical <br />5,921.00 SF 0.00 <br />1.19 <br />710.23 <br />1,409,20 <br />9,165.42 <br />spray - Heavy <br />Note : Pressure washing to remove dirt and dust plus old paint <br />11. Painter -per hour <br />20.00 Hli 0.00 <br />113.51 <br />228.84 <br />454.04 <br />2,953.08 <br />Note : Extra time to mask off signs and hog wire that are high off the ground <br />Totals: Grandstands <br />4,808.74 <br />9,541.16 <br />62,055.71 <br />24-0275-CUSTOM <br />5/22/2024 <br />Page:2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.