Laserfiche WebLink
CHAPTER 4: ALTERNATIVES EVALUATION CRITERIA <br /> 4.2 Tier 1 Evaluation Based on public comments, scores were <br /> Approach and Results adjusted, and new criteria were added to <br /> l�l� two separate Project Goals—Safety and <br /> As presented in Chapter 3, existing conditions Transportation Demand. <br /> in the study area were identified based <br /> Table 4-2 presents each alternative's revised <br /> on each Evaluation Criterion topic(as <br /> Performance Measurement(rating)for the <br /> appropriate). Alternatives were then evaluated, <br /> identified evaluation criteria. <br /> using baseline conditions, and were given a <br /> Performance Measurement rating. This initial <br /> evaluation was presented to the public at an <br /> open house in February 2024. <br /> A ~ [r - F� � 1ST � � .�•' -T _ <br /> VOLUME 1: FEASIBILITY REPORT 1-90 Corridor - Easton to Cle Elunn Feasibility Study 1 57 <br />