My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7-22-2024_PW_CDS SS Briefings
>
Meetings
>
2024
>
07. July
>
2024-07-22 1:30 PM - Public Works & CDS Study Session
>
7-22-2024_PW_CDS SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 11:25:31 AM
Creation date
7/18/2024 11:11:48 AM
Metadata
Fields
Template:
Meeting
Date
7/22/2024
Meeting title
Public Works & CDS Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 4: ALTERNATIVES EVALUATION CRITERIA <br /> 4.2 Tier 1 Evaluation Based on public comments, scores were <br /> Approach and Results adjusted, and new criteria were added to <br /> l�l� two separate Project Goals—Safety and <br /> As presented in Chapter 3, existing conditions Transportation Demand. <br /> in the study area were identified based <br /> Table 4-2 presents each alternative's revised <br /> on each Evaluation Criterion topic(as <br /> Performance Measurement(rating)for the <br /> appropriate). Alternatives were then evaluated, <br /> identified evaluation criteria. <br /> using baseline conditions, and were given a <br /> Performance Measurement rating. This initial <br /> evaluation was presented to the public at an <br /> open house in February 2024. <br /> A ~ [r - F� � 1ST � � .�•' -T _ <br /> VOLUME 1: FEASIBILITY REPORT 1-90 Corridor - Easton to Cle Elunn Feasibility Study 1 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.