My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7-22-2024_PW_CDS SS Briefings
>
Meetings
>
2024
>
07. July
>
2024-07-22 1:30 PM - Public Works & CDS Study Session
>
7-22-2024_PW_CDS SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 11:25:31 AM
Creation date
7/18/2024 11:11:48 AM
Metadata
Fields
Template:
Meeting
Date
7/22/2024
Meeting title
Public Works & CDS Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 3: EXISTING CONDITIONS IN THE STUDY AREA <br /> Primary emphases for the Highway System Washington State Rail Plan <br /> Plan include: The Washington State Rail Plan 2019-2040 <br /> • Congestion relief (WSDOT 2020) outlines strategies and priorities <br /> • Preservation of existing investments for managing and enhancing the state's <br /> passenger and freight rail transportation <br /> • Improvement of traveler safety network.The purpose of the Plan is to identify <br /> • Efficient movement of freight and goods future needs and strategies to: <br /> • Improvement and integration of all <br /> transportation modes to create a seamless Meet the increasing demand for passenger <br /> intermodal transportation system for and freight rail services in Washington <br /> people and goods in partnership with private rail carriers <br /> that own much of the network over which <br /> Washington State Freight System Plan passenger and freight trains operate. <br /> The Washington State Freight System Plan • Develop more efficient and effective <br /> (WSDOT 2022) outlines strategies and priorities connections between rail and other modes <br /> for managing and enhancing the state's freight of transportation. <br /> transportation network. It aims to support • Ensure the sustainability of Washington's <br /> the efficient movement of goods to and from public and private short line railroads that <br /> Washington's ports, airports, railroads, and face infrastructure investment needs in <br /> highways while addressing challenges such order to preserve these important services <br /> as congestion, safety, and environmental to communities. <br /> sustainability. <br /> IL 41 <br /> 01111* <br /> On <br /> _ �r ! <br /> no Cie Elurn <br /> River <br /> AA M <br /> � r <br /> �' 1� • -- r/ I s _ <br /> VOLUME I: FEASIBILITY REPORT 1-90 Corridor Easton to Cle Elum Feasibility Study 1 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.