My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7-22-2024_PW_CDS SS Briefings
>
Meetings
>
2024
>
07. July
>
2024-07-22 1:30 PM - Public Works & CDS Study Session
>
7-22-2024_PW_CDS SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 11:25:31 AM
Creation date
7/18/2024 11:11:48 AM
Metadata
Fields
Template:
Meeting
Date
7/22/2024
Meeting title
Public Works & CDS Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 EXISTING CONDITIONS IN <br /> THE STUDY AREA <br /> The study area is located along the 1-90 <br /> corridor from Easton to Cle Elum in Chapter <br /> Upper Kittitas County and includes 1-90 <br /> and surrounding county and local roads. Current conditions in the study area . <br /> Communities in the study area include Easton, * Safety <br /> Cle Elum, South Cle Elum, Roslyn, Nelson, and * Transportation and Freight Mobility <br /> Ronald. The following sections provide an * Environment <br /> overview of the current transportation and Resilience <br /> traffic conditions along the roadways, as well <br /> as existing environmental and community <br /> conditions within the study area. <br /> Each section is organized based on the project <br /> goals and evaluation criteria discussed in <br /> Chapter Four. <br /> f f <br /> `y a <br /> 4►- CIO <br /> VOLUME I: FEASIBILITY REPORT 1-90 Corridor Easton to Cle Elunn Feasibility Study 1 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.