My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7-22-2024_PW_CDS SS Briefings
>
Meetings
>
2024
>
07. July
>
2024-07-22 1:30 PM - Public Works & CDS Study Session
>
7-22-2024_PW_CDS SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 11:25:31 AM
Creation date
7/18/2024 11:11:48 AM
Metadata
Fields
Template:
Meeting
Date
7/22/2024
Meeting title
Public Works & CDS Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 2: RANGE OF ALTERNATIVES <br /> • Existing on and off ramps between MP 70 of 1-90 in either direction and be able to <br /> and MP 85 would not require alteration perform construction, maintenance, and <br /> unless the new bridge overcrossing. preservation duties in the safest work zone <br /> • This alternative may be conducive to environment, <br /> providing an emergency detour/bypass Commercial truck weigh station <br /> route when incidents require the closure notifications, methods, or locations would <br /> of the existing eastbound or westbound need to be relocated before MP 70 and MP <br /> 1-90 lanes within MP 70 and 85 (collisions, 85 before entering the bypass/reversible <br /> wildfires, roadway repairs). lanes. <br /> • This option allows WSDOT Maintenance <br /> or contractors to fully close two lanes <br /> VOLUME I: FEASIBILITY REPORT 1-90 Corridor Easton to Cle Elum Feasibility Study 1 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.