My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7-22-2024_PW_CDS SS Briefings
>
Meetings
>
2024
>
07. July
>
2024-07-22 1:30 PM - Public Works & CDS Study Session
>
7-22-2024_PW_CDS SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 11:25:31 AM
Creation date
7/18/2024 11:11:48 AM
Metadata
Fields
Template:
Meeting
Date
7/22/2024
Meeting title
Public Works & CDS Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 2: RANGE OF ALTERNATIVES <br /> 2.1 No Build Alternative Considerations <br /> (Existing Conditions) Based on a 2019 analysis performed along <br /> This alternative would leave 1-90 between MP this corridor(Appendix A), key results <br /> 70 and MP 85 in its current configuration, with indicated congestion along 1-90 is heaviest <br /> no changes to its posted speed, lane width, during summer weekends and major <br /> or access points.The No Build Alternative is <br /> holidays (Memorial Day, 4th of July, and <br /> referred to as Alternative 6 throughout this Labor Day). <br /> document. During these periods of congestion, speeds <br /> drop from an average of 70 mph to 10 mph <br /> Description on 1-90, and increase by approximately 5 <br /> mph on county roads, reflecting that non- <br /> This section of 1-90 provides two 12-foot wide local travelers tend to speed along the <br /> lanes in each direction,with inside shoulders local roads as they avoid 1-90 congestion. <br /> of 5 feet and outside shoulders of 10 feet.The . On those specific holiday weekends, <br /> median is a 66-foot-wide grassy area, which <br /> congestion lasts for 10 hours on I-90, <br /> currently serves as storage for snow during while diversion and increased speed lasts <br /> severe winter conditions. Current posted approximately 6 hours on the county roads. <br /> speeds along this section of 1-90 are 70 mph. <br /> Figure 2-2 shows a perspective rendering of the <br /> existing conditions. <br /> �. :. <br /> ? ` •�`_ } yam: ~7 <br /> Figure 2-2 No Build Conditions(Alternative 6) <br /> VOLUME I: FEASIBILITY REPORT 1-90 Corridor - Easton to Cle Elunn Feasibility Study 1 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.