My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7-22-2024_PW_CDS SS Briefings
>
Meetings
>
2024
>
07. July
>
2024-07-22 1:30 PM - Public Works & CDS Study Session
>
7-22-2024_PW_CDS SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 11:25:31 AM
Creation date
7/18/2024 11:11:48 AM
Metadata
Fields
Template:
Meeting
Date
7/22/2024
Meeting title
Public Works & CDS Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LIST OF TABLES <br /> Table1-1 WSDOT M2 and M3 Teams.................................................................................................................................5 <br /> Table 1-2 Feasibility Study Process and Approach.......................................................................................................7 <br /> Table 3-1 Collision Types along 1-90 in the Study Area,2018 through 2023........................................................29 <br /> Table 3-2 Collisions by Injury Severity along 1-90 in the Study Area, 2018 through 2023................................29 <br /> Table 3-3 Injury Severity by Collision Type along 1-90 in the Study Area, 2018 through 2023........................30 <br /> Table 3-4 Injury Severity by Time of Year along 1-90 in the Study Area,2018 through 2023............................30 <br /> Table 3-5 Injury Severity by Road Conditions along 1-90 in the Study Area,2018 through 2023......................31 <br /> Table 3-7 ESA Listed Species Potential Presence and Designated Critical Habitat Adjacent to <br /> EachAlternative................................................................................................................................................44 <br /> Table 3-8 Select Socioeconomic Indicators.................................................................................................................49 <br /> Table 3-9 Environmental Health Disparities Summary for the 1-90 Corridor Study Area................................50 <br /> Table 4-1 Tier 1: Initial and Revised Evaluation - Project Goals, Criteria, Performance <br /> Measurements,and Weight...........................................................................................................................54 <br /> Table 4-2 Tier 1 Evaluation Results- Non-Weighted.................................................................................................58 <br /> Table 4-3 Tier 1 Evaluation -Weighted Scores............................................................................................................61 <br /> Table 4-4 Tier 2:Targeted Evaluation -Additional Criteria and Rating Descriptions.......................................64 <br /> Table 4-5 Tier 2 Evaluation Results- Non-Weighted.................................................................................................66 <br /> Table 4-6 Tier 2 Evaluation - 1-90 Alternatives Weighted Scores...........................................................................69 <br /> Table 5-1 Stakeholders Contacted and Interviewed.................................................................................................74 <br /> Table 5-2 Public Survey 1,Summer 2023 -Survey Questions.................................................................................75 <br /> Table 5-3 Public Survey 2, February 2024-Survey Results......................................................................................77 <br /> Table 5-4 Webinar 1,August 2023 - Questions and Answers..................................................................................79 <br /> IIIIIIIIIIIIM <br /> VOLUME 1: FEASIBILITY REPORT 1-90 Corridor-Easton to Cie Elum Feasibility Study I viii <br />
The URL can be used to link to this page
Your browser does not support the video tag.