Laserfiche WebLink
LIST OF APPENDICES <br /> The appendices listed below can be found in the 1-90 Corridor-Easton to Cie Elum Feasibility <br /> Study,Volume 11:Appendices. <br /> Appendix A Traffic Modeling Reports-2019 and 2024 <br /> Appendix B Environmental Maps-2024 <br /> Appendix C Cultural Resources Review- 2024 <br /> Appendix D FHWA Screening Tool for Equity Analysis of Projects (STEAP) Data <br /> Appendix E EJ Screen Results <br /> Appendix F Detailed Evaluation Worksheets for Each Alternative <br /> Appendix G In-depth Environmental Evaluation by Alternative <br /> Appendix H Detailed Evaluation Worksheets for the 1-90 Alternatives <br /> Appendix I Public Survey Results - Summer 2023 <br /> Appendix J Public Survey Results - February 2024 <br /> Appendix K Webinar Polling Results - February 2024 <br /> VOLUME 1: FEASIBILITY REPORT 1-90 Corridor-Easton to Cie Elunn Feasibility Study I vi <br />