My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7-22-2024_PW_CDS SS Briefings
>
Meetings
>
2024
>
07. July
>
2024-07-22 1:30 PM - Public Works & CDS Study Session
>
7-22-2024_PW_CDS SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 11:25:31 AM
Creation date
7/18/2024 11:11:48 AM
Metadata
Fields
Template:
Meeting
Date
7/22/2024
Meeting title
Public Works & CDS Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 4: ALTERNATIVES EVALUATION CRITERIA <br /> Figure 4-2 Tier 2 Evaluation Summary by Alternative- Weighted Score <br /> 70.0 <br /> 60,0 <br /> 50.0 <br /> 40.0 f <br /> i <br /> i <br /> 30.0 <br /> 20.0 <br /> 10.0 <br /> 0.0 � <br /> Alt 1 Alt 2 Alt 3 <br /> ■Relative Cost of Alternatives 3.3 3.3 0.0 <br /> Equity/Inclusion 6.7 8.3 8.3 <br /> ■ Resiliency 9.0 7.5 7.5 <br /> ■Environmental 6.0 6.0 6.0 <br /> IR Freight Mobility 6.7 6.7 6.7 <br /> III Safety 20.0 20.0 22.5 <br /> ■Transportation Demand 8.6 8.6 7.9 <br /> VOLUME I: FEASIBILITY REPORT 1-90 Corridor- Easton to Cle Elum Feasibility Study 70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.