My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SH24-011 E24-339
>
Meetings
>
2024
>
07. July
>
2024-07-02 10:00 AM - Commissioners' Agenda
>
SH24-011 E24-339
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2024 12:38:18 PM
Creation date
6/27/2024 12:32:41 PM
Metadata
Fields
Template:
Meeting
Date
7/2/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Acknowledge the FFY22 EMPG (Emergency Management Performance Grant) Agreement E24-339
Order
9
Placement
Consent Agenda
Row ID
119620
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recipients and subreciplents of federal financial assistance programs for infrastructure are hereby notified that none of the <br />funds provided under this award may be used for a project for infrastructure unless: <br />(1) all iron and steel used in the project are produced in the United States --this means all manufacturing processes, from the <br />initial melting stage through the application of coatings, occurred In the United States; <br />(2) all manufactured products used In the project are produced in the United States --this means the manufactured product was <br />manufactured in the United States; and the cost of the components of the manufactured product that are mined, produced, or <br />manufactured in the United States Is greater than 55 percent of the total cost of all components of the manufactured product, <br />unless another standard for determining the minimum amount of domestic content of the manufactured product has been <br />established under applicable law or regulation; and <br />(3) all construction materials are manufactured in the United States --this means that all manufacturing processes for the <br />construction material occurred in the United States. <br />The Buy America preference only applies to articles, materials, and supplies that are consumed in, incorporated into, or <br />affixed to an Infrastructure project. As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, <br />brought to the construction site and removed at or before the completion of the Infrastructure project. Nor does a Buy America <br />preference apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are <br />used at or within the finished infrastructure project, but are not an integral part of the structure or permanently affixed to the <br />infrastructure project - -- -- --- -- - - — --- <br />Waivers <br />When necessary, recipients may apply for, and the agency may grant, a waiver from these requirements. <br />(a) When the federal agency has made a determination that one of the following exceptions applies, the awarding official may <br />waive the application of the domestic content procurement preference in any case in which the agency determines that: <br />(1) applying the domestic content procurement preference would be Inconsistent with the public Interest; <br />(2) the types of iron, steel, manufactured products, or construction materials are not produced In the United States in <br />sufficient and Lee son.q#Ay availad"uantities or of-a_satisfactory quality; or <br />(3) the inclusion of iron, steel, manufactured products, or construction materials produced in the United States will increase <br />the cost of the overall project by more than 25 percent. <br />A request to waive the application of the domestic content procurement preference must be in writing. The agency will provide <br />instructions on the format, contents, and supporting materials required for any waiver request. Waiver requests are subject to <br />public comment periods of no less than 15 days and must be reviewed by the OMB Made in America Office. <br />There may be Instances where an award qualifies, in whole or in part, for an existing waiver described. For awards by the <br />Federal Emergency Management Agency (FEMA), existing waivers are available and the waiver process Is described at <br />"BW America" Preference in FEMA Financial Assistance Programs for Infrastructure j FEMA goy. For awards by other DHS <br />components, please contact the applicable DHS FAO. <br />To see whether a particular DHS federal financial assistance program is considered an infrastructure program and thus <br />required to include a Buy America preference, please either contact the applicable DHS FAO, or for FEMA awards, please <br />see Proarams and Definitions- Build America Buv America Act I FEMA.aov. <br />Article XXXV - SAFECOM <br />Recipients receiving federal financial assistance awards made under programs that provide emergency communication <br />equipment and its related activities must comply with the SAFECOM Guidance for Emergency Communication Grants, <br />Including provisions on technical standards that ensure and enhance interoperabie communications. <br />Article XXXVI - Terrorist Financing <br />Recipients must comply with E.O. 13224 and U.S. laws that prohibit transactions with, and the provisions of resources and <br />support to, Individuals and organizations associated with terrorism. Recipients are legally responsible to ensure compliance <br />with the Order and laws. <br />Article XXXVII - Trafficking Victims Protection Act of 2000 (TVPA) <br />Trafficking in Persons: <br />DHS-FEMA-EMPG-FY22 Page 32 of 38 Kittitas County, E24-338 <br />
The URL can be used to link to this page
Your browser does not support the video tag.