My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SH24-012 E24-341 Grant Agreement
>
Meetings
>
2024
>
07. July
>
2024-07-02 10:00 AM - Commissioners' Agenda
>
SH24-012 E24-341 Grant Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2024 12:38:35 PM
Creation date
6/27/2024 12:32:40 PM
Metadata
Fields
Template:
Meeting
Date
7/2/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Acknowledge FFY23 EMPG (Emergency Management Performance Grant) Agreement E24-341
Order
8
Placement
Consent Agenda
Row ID
119620
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d. The Subrecipient agrees that to receive any federal preparedness funding, all EHP <br />compliance requirements outlined in applicable guidance must be met. The EHP review <br />process must be completed and FEMA approval received by the Subrecipient before <br />any work Is started for which reimbursement will be later requested. Expenditures for <br />projects started before completion of the EHP review process and receipt of approval by <br />the Subrecipient will not be reimbursed. <br />7. PROCUREMENT <br />The Subrecipient shall comply with all procurement requirements of 2 CFR Part 200.317 through <br />200.327 and as specified in the General Terms and Conditions (Attachment B, A.10). <br />a. For all contracts expected to exceed the simplified acquisition threshold, per 2 CFR 200.1, <br />the Subrecipient must notify the Department. The Department may request pre - <br />procurement documents, such as request for proposals, invitations for bids and <br />independent cost estimates. This requirement must be passed on to any non-federal entity <br />to which the Subrecipient makes a subaward, at which point the Subrecipient will be <br />responsible for requesting and reviewing pre -procurement documents. <br />b. For all sole source contracts expected to exceed the micro -purchase threshold per 2 CFR <br />200.1, the Subrecipient must submit justification to the Department for review and <br />approval. This requirement must be passed on to any non-federal entity to which the <br />Subrecipient makes a subaward, at which point the Subrecipient will be responsible for <br />reviewing and approving sole source justifications to any non-federal entity to which <br />Subrecipient makes any award. <br />C. The Subrecipient as well as its contractors and subcontractors must comply with the Build <br />America, Buy America Act (BABAA), which was enacted as a part of the Infrastructure <br />Investment and Jobs Act §§ 70901-70297, Pub. L. No. 117-58 (2021); and Executive <br />Order 14005, Ensuring the Future is Made in All of America by All of America's Workers. <br />BABAA requiresany infrastructure project receiving -federal funning must -ensure: <br />i. All iron and steel used in the project are produced in the United States. This means <br />all manufacturing processes, from initial melting stage through the application of <br />coatings, occurred in the United States. <br />All manufactured products must be produced in the United States. For a <br />manufactured product to be considered produced in the United States, the cost of <br />the components of the manufactured product that are mined, produced, or <br />manufactured in the United States must be greater than 55% of the total cost of all <br />minimum amount of domestic content of manufactured product, unless subject to <br />another standard. <br />iii. All construction materials are manufactured in the United States. This means that <br />all manufacturing processes for construction material occurred in the United States. <br />Additionally, applicable infrastructure projects are subject to domestic preference <br />requirements. A domestic preference does not apply to non -infrastructure spending under <br />an award that also includes a covered project. A domestic preference applies to an entire <br />infrastructure project, even if it is funded by both federal and non-federal funds under one <br />or more awards. <br />Domestic preferences under BABAA only apply to articles, materials, and supplies <br />that are consumed in, incorporated into, or affixed to an infrastructure project. As <br />such, it does not apply to tools, equipment, and supplies, such as temporary <br />scaffolding, brought to the construction site and removed at or before the <br />completion of the infrastructure project. Nor does a domestic preference apply to <br />equipment and furnishings, such as movable chairs, desks, and portable computer <br />equipment, that are used at or within the finished infrastructure project but are not <br />an integral part of or permanently affixed to the structure. <br />Infrastructure, for the purposes of BABAA, includes, at a minimum, the structures, <br />facilities, and equipment for, in the United States, roads, highways and bridges; <br />DHS-FEMA-EMPG-FY23 Page 9 of 41 Kittitas County, E24-341 <br />
The URL can be used to link to this page
Your browser does not support the video tag.