Laserfiche WebLink
COST: $11,328.00 <br />Billings will occur monthly, see below for details. AEU will furnish a schedule of <br />values based on AIA format. <br />Please feel free to contact me with any questions. You may reach me by email @ <br />JohnOaeulnc com, on my office phone (360) 567-3330, or on my cell at (360) 798- <br />8546. <br />Sincerely, <br />Johw LDvgt�i n <br />Estimator <br />If you accept this proposal and authorize work to begin, please <br />sign, date and email or fax to 360-5673320 for countersignature. <br />Signature of authorized representative for the buyer. <br />Printed Name: <br />Date: <br />PO M, .' <br />Please Note - <br />This offer is valid for (10) days from the date of this document unless noted otherwise above. Please note. No energized electrical work is <br />included. This work is to be provided during normal operating hours. This offer is predicated upon the execution of a mutually negotiated <br />contract and project schedule inducing, at the minimum, the attachment of this proposal as a contract exhibit. <br />Project was bid without inclusions for disruption of continual work from start to finish. Uless otherwise rioted in this proposal, remobilization fee <br />will be charged if crews are unable to continue progress from incurred disruptions in work or access to the worts area. When complete project <br />information is made available then an alternate construction and payment method shall be renegotiated and agreed upon before work <br />commences. <br />Exclw,ions- <br />Nothing is included that is riot specified including: code corrections to existing electrical, changes required by AHJ, Washington State sales <br />tax, light pole base engineering, seismic, fire alarm, security, burglar alarm, video surveillance, card access, Covid 19 related delay or <br />schedule impact, sheetrodc cuttiriglpatching/painting of any kind, ceiling wires or slack wires, final cleaning, temporary lighting, temporary <br />power, concrete saw -cutting, pouring, patching, flat work, bollards, core drilling, underground excavation, boring, or back ill, vac buck, raceway <br />cleaning, raceway proofing, fire seafmg, roof penetrations, fire caulking, or Power, Communications, and Tele data Utility fees included i.e.., <br />aid to construction and systems development <br />E <br />This budget proposal is conditioned upon the ability to complete the premises at present prices for materials and equipment. If AEU is unable <br />to complete the above -described project at current prices for materials and equipment, the contract sum shall be equitably adjusted to <br />compensate for increased costs. A change in price of an Rem of material or equipment will be considered significant when the price increases <br />150/6 Between the date of this budget and the date of the appkable work. <br />Billing & Payment Terms - <br />The Contractor will invoice the Customer typically at monthly intervals, and/or at the end of a project. Invoices will be sent via email to <br />Customer's designated representative listed above. The Contractor reserves the right to bill for materials purchased. but not yet delivered or <br />on site. The default due date for payment will be 30 days from the invoice date and will be listed on each invoice. Interest will accrue on late <br />payments at a rate of 1.5% per month. <br />