My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_CRP No.320-24_VantageHighwayPaving
>
Meetings
>
2024
>
05. May
>
2024-05-21 10:00 AM - Commissioners' Agenda
>
Resolution_CRP No.320-24_VantageHighwayPaving
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2024 12:54:45 PM
Creation date
5/16/2024 12:54:32 PM
Metadata
Fields
Template:
Meeting
Date
5/21/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Initiating County Road Project Designated as CRP No. 320-24, 2024 Vantage Highway Paving
Order
11
Placement
Consent Agenda
Row ID
118340
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. <br />BEFORE THE BOARD OF COUNTY C <br />of initiating a county road project designated as: <br />CRP NO: 320-24 JOB NO: RC 2299 <br />OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter <br />IT IS HEREBY RESOLVED that the 2024 Vantage Highway Paving be improved as follows: <br />The project will plane the existing asphalt surface on Vantage Highway MP 6.56 - MP 11.17 and replace the asphalt with <br />a new hot mixed asphalt wearing surface and install new roadway striping and markings. The project will also contemplate <br />necessary safety upgrades to existing infrastructure. <br />ARTERIAL x <br />ACCESS <br />This project is hereby declared to be a public necessity and the County Engineer is hereby ordered and authorized to report and <br />proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). <br />IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County <br />Engineers estimate, is hereby made in the amounts and for the purposes shown: <br />EN <br />F-/ <br />F-4 <br />PURPOSE <br />AMOUNT <br />TOTALS <br />PRELIMINARY ENGINEERING <br />$ 200,000 <br />CONSTRUCTION ENGINEERING <br />$ 250,000 <br />RIGHT-OF-WAY ACQUISITION <br />$ <br />SUB -TOTAL <br />$ 450,000 <br />County Forces CONSTRUCTION <br />$ <br />CONTRACT CONSTRUCTION <br />$ 2,500,000 <br />SUB -TOTAL <br />$ 2,500,000 <br />TOTAL PROJECT COST <br />$ 2,950,000 <br />GRANT OR OTHER FUNDS <br />$ 2,551,750 <br />Is <br />Grant Source: STBG A <br />TOTAL COUNTY ROAD FUND ALLOCATION <br />398,250 <br />Cameron Curtis, P.E. <br />County Engineer <br />THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2023 ANNUAL ROAD PROGRAM AS <br />ITEM NO. <br />THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM PROJECT 13 <br />IN ACCORDANCE WITH RCW 36.81.130 <br />IT IS FURTHER RESOLVED THAT: <br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ. <br />THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND <br />WAC 136-1B. <br />ADOPTED this 21 st day of May, 2024. <br />BOARD OF COUNTY COMMISSIONERS <br />KITTITAS COUNTY, WASHINGTON <br />Attest: <br />Clerk of the Board <br />Cory Wright, Commissioner <br />Brett Wachsmith, Chair <br />Laura Osiadacz, Vice -Chair <br />g:\base\forms\eng\crp-frm 5/1512024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.