My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-04-08-minutes-public-works-study-session
>
Meetings
>
2024
>
04. April
>
2024-04-16 10:00 AM - Commissioners' Agenda
>
2024-04-08-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2024 11:58:52 AM
Creation date
4/11/2024 1:08:26 PM
Metadata
Fields
Template:
Meeting
Date
4/16/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Dept
PW
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
116716
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Data limitations and extrapolating results <br />Our survey included all governments required to report on permit review time performance, so <br />the results demonstrate the overall level of compliance with state law. The responses from required <br />governments about why they did not post reports are similarly representative of the entire state because <br />it included all required governments. <br />In addition, for those governments that said they did not post permit performance reports, we did not <br />search their websites to corroborate their responses. It is therefore possible that some governments that <br />said they do not post these reports do include some or all the information listed in state law on their <br />websites. <br />Work on internal controls <br />Internal controls were significant within the context of the audit objectives. We assessed each local <br />government's design for specific controls to determine if they would be capable of achieving their <br />objectives. We also assessed whether these controls were in place during the audit period. However, we <br />did not assess the operational effectiveness of these controls. We specifically evaluated the following <br />controls: <br />Timeliness of permit review. We evaluated whether the local governments had established review <br />time periods for each type of project permit as required by state law. We also evaluated whether <br />local governments published annual reports on permit performance statistics. We interviewed <br />government officials and reviewed documents such as local ordinances and reports to determine <br />if these controls were in place. Several governments did not publish annual permit reports, which <br />represents a deficiency in internal control. We did not assess the operational effectiveness for these <br />controls where they did exist. <br />Sufficient staffing to assist applicants and meet permit review timelines. We evaluated whether <br />the local governments had designated staff positions to assist applicants during the permit process. <br />We also evaluated whether local governments had any staffing contingencies such as on -call <br />contractors to respond to periods of high permit activity. We interviewed government staff and <br />reviewed documents such as position descriptions and contracts to determine if these controls <br />were in place. We did not assess the operational effectiveness for these controls. <br />Education and outreach to permit applicants. We evaluated whether the local governments <br />had developed educational and outreach materials to explain the permit process to applicants <br />and help them understand how to submit complete applications. We interviewed government <br />staff and reviewed documents such as permit checklists and other application materials to <br />determine if these controls were in place. We did not assess the operational effectiveness for these <br />controls. <br />Monitoring and continuous improvement of permitting processes. We evaluated whether the <br />local governments monitored their permitting processes and conducted continuous improvement <br />efforts related to ensuring they met the 120-day review timeline. We interviewed government staff <br />and reviewed documents such as project charters and reports to determine if these controls were <br />in place. We did not assess the operational effectiveness for these controls. <br />Growth Management Act Appendix B 1 56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.