My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed WSPRC
>
Meetings
>
2024
>
02. February
>
2024-02-20 10:00 AM - Commissioners' Agenda
>
Fully Executed WSPRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 12:59:54 PM
Creation date
4/9/2024 12:58:49 PM
Metadata
Fields
Template:
Meeting
Date
2/20/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Acknowledge the Federal Financial Assistance Grant Award Subrecipient Agreement between the Washington State Parks and Recreation Commission and the Kittitas County Sheriff’s Office
Order
8
Placement
Consent Agenda
Row ID
114588
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope lD: D7339268-F986-48F4-A980-B92B3E73AFEB <br />Washi n State Parks & Recreation Commission <br />o Blue lighting equipment <br />o Hailers <br />o Global positioning system (GPS) units <br />o Personal breath testers (PBT) <br />o Cellphones used 100% RBS only, or prorated for a percentage of time used on <br />boat <br />o Baftery chargers and computers dedicated to program use <br />o lncludes brackets and fittings for installation and use <br />. Fluids for hydraulic system <br />. Fuel, fuel additives and filters; associated disposalfees <br />r Gear oilfor lower units <br />r Glass replacement and costs to install, associated disposalfees <br />. Grease and lubricants <br />r Oil and oilfilters; associated disposalfees <br />o Parts and labor for regular scheduled maintenance and scheduled replacement <br />o Parts for replacement on the vessel when failure occurs or when damaged and labor, <br />which includes engine, lower unit and cooling system repairs and replacement <br />. Vessel canvas tops and side covers; includes repairs and replacement of <br />canvas/vinyl/plastic material and framing structures <br />Vessel hull and structural repairs/replacement of railings, pilot house, decks, cleats, <br />ladders, swim platforms, Sampson posts, fittings, towing equipment, davits, anchors, <br />chain, and associated hardware and fittings <br />ASSOCIATED EQUIPi'ENT FOR PATROL VESSELS <br />o Cost of emergenoy response and rescue equipment repair, replacement and <br />maintenance, including: stretchers, first aid/first responder kits and materials, fire <br />suppression equipment and supplies. <br />o Cost of fees related to cell phone charges, annual registration charges, renewal fees, <br />and insurance are prorated for percentage of time used performing RBS missions. <br />r Cost of haul-outs and associated costs with cleaning and maintenance of hull, fixtures <br />and drive systems, and associated disposalfees. <br />r Costs related to moorage, including cost of water/electricity associated with maintenance <br />and moorage. <br />r Cost of required safety equipment on the vessel when replacement, repair, or regular <br />maintenance is needed to meet state/federalregulations and maintain USCG standards. <br />For example: <br />o Life jackets, replacement parts (clips, hooks, CO2 cartridges and re-arm kits) and <br />stenciling/screening of agency name or law enforcement <br />a <br />Page 6 of 9
The URL can be used to link to this page
Your browser does not support the video tag.