Laserfiche WebLink
City of Shoreline <br /> Shoreline Municipal Code 20.30.140 Permit processing time limits. <br /> A. Decisions under Type A,B or C actions shall be made within 120 days from the date of a <br /> determination that the application is complete.Exceptions to this 120-day time limit are: <br /> 4. Substantial project revisions made or requested by an applicant,in which case the 120 days will <br /> be calculated from the time that the City determines the revised application to be complete. <br /> 5. The time required to prepare and issue a draft and final Environmental Impact Statement(EIS) <br /> in accordance with the State Environmental Policy Act. <br /> 6. Any period for administrative appeals of project permits. <br /> 7. An extension of time mutually agreed upon in writing by the Department and the <br /> applicant. <br /> 8. Amendments to the Comprehensive Plan or Code. <br /> B. The time limits set for Type A,B,and C actions do not include: <br /> 1. Any period of time during which the applicant has been requested by the Department to correct <br /> plans,perform studies or provide additional information.This period of time shall be calculated <br /> from the date the Department notifies the applicant of the need for additional information,until <br /> the date the Department determines that the additional information satisfies the request for such <br /> information or 14 days after the date the information has been provided to the Department, <br /> whichever is earlier. <br /> 2. If the Department determines that the additional information submitted to the Department by the <br /> applicant under subsection(13)(1) of this section is insufficient,the Department shall notify the <br /> applicant of the deficiencies,and the procedures provided in subsection(13)(1)of this section shall <br /> apply as if a new request for studies has been made. <br /> C. If the Department is unable to issue its final decision on a project permit application within the time <br /> limits provided for in this section,it shall provide written notice of this fact to the project applicant.The <br /> notice shall include a statement of reasons why the time limit has not been met and an estimated date for <br /> issuance of the notice of decision. (Ord.406§ 13 2006;Ord.238 Ch.III§4(g),2000). <br /> Growth Management Act Appendix D 1 64 <br />