Laserfiche WebLink
Kittitas County TS Project <br />Amendment 2 Costs <br />Title Unit Rate Unit (Hrs) Total <br />Project Director 295.00$ 1.5 442.50$ <br />Project Manager 282.00$ 6 1,692.00$ <br />Lead Engineer 207.00$ 22 4,554.00$ <br />Civil/Stormwater Engineer 196.00$ 131.5 25,774.00$ <br />Designer/Drafter 107.00$ 71 7,597.00$ <br />Composting 260.00$ 1 260.00$ <br />Project Engineer 115.00$ 19 2,185.00$ <br />Sr Project Engineer 150.00$ 14.5 2,175.00$ <br />Sub-Total, SCS Labor Costs = 44,679.50$ <br />Name of Sub-Consultant Unit Rate Unit Total <br />FSI 13,200.00$ 1 13,200.00$ <br />Lund-Opsahl 6,041.50$ 1 6,041.50$ <br />Rolluda 2,475.00$ 1 2,475.00$ <br />Sub-Total, Sub-Consultant Costs = 21,716.50$ <br />Total for Fire System Redesign= 66,396.00$ <br />Title Unit Rate Unit (Hrs) Total <br />Project Director 295.00$ 0 -$ <br />Project Manager 282.00$ 2 564.00$ <br />Lead Engineer 207.00$ 6 1,242.00$ <br />Civil/Stormwater Engineer 196.00$ 33 6,468.00$ <br />Designer/Drafter 107.00$ 20 2,140.00$ <br />Composting 260.00$ 0 -$ <br />Project Engineer 115.00$ 4 460.00$ <br />Sr Project Engineer 150.00$ 5 750.00$ <br />Sub-Total, SCS Labor Costs = 11,624.00$ <br />Name of Sub-Consultant Unit Rate Unit Total <br />FSI -$ 1 -$ <br />Lund-Opsahl 8,030.00$ 1 8,030.00$ <br />Rolluda -$ 1 -$ <br />Sub-Total, Sub-Consultant Costs = 8,030.00$ <br />Total for MRW Bldg. Scope Change = 19,654.00$ <br />Table 2. Amendment 2 Cost Breakup by Task <br />Task 1. Fire System Re-Design <br />Task 2. MRW Bldg. Scope Change <br />1B. Fire System Re-Design, SCS Sub-Consultant Costs <br />2A. MRW Bldg. Scope Change, SCS Labor Costs <br />2B. MRW Bldg. Scope Change, SCS Sub-Consultant Costs <br />1A. Fire System Re-Design, SCS Labor Costs <br />Page 2 of 2 January 2024