Draft: 2/13/24 TASK 1 JAIL RENOVATIONS Page 3 of <br />FOR KITTITAS COUNTY <br />n-nrt" 111nitl SSA I Fqr_ cnct <br />JAIL RENOVATION WORK: <br />(Continued from the previous page.) <br />Mobilization. <br />1.00 <br />LS <br />$2,000.00 <br />$2,000.00 <br />Allowance for set-up & coordination. <br />Provisions for staging and storage. <br />1.00 <br />LS <br />$1,000.00 <br />$1,000.00 <br />Mostly from contractor vans, possibly an onsite container. <br />Interior demolition and prep. <br />4.00 <br />MD <br />$960.00 <br />$3,840.00 <br />#2/A2.10, removal of gage framed security wall & fixtures. <br />New stainless partition with an access panel. <br />180.00 <br />SF <br />$75.00 <br />$13,500.00 <br />Per #2/A2.10, roughly 15 LF with hardening premiums. <br />Plumbing modifications. <br />1.00 <br />LS <br />$6,500.00 <br />$6,500.00 <br />Various plumbing revamping, based on a Hultz budget. <br />Electrical modifications. <br />1.00 <br />LS <br />$6,500.00 <br />$6,500.00 <br />Various electrical revamping, based on a BHU budget. <br />Interior restoration, clean-up & pick-up. <br />3.00 <br />MD <br />$960.00 <br />$2,880.00 <br />Allowance for Janitor & Kitchen renovation work. <br />Add for access & logistics premiums. <br />0.50 <br />LS <br />$36,220.00 <br />$18,110.00 <br />Allowance for working in a secured area. <br />3) 19tchen & Janitor Room Modifications, Before G.C. <br />Mark -Ups: <br />$54,330.00 <br />Mobilization. <br />1.00 <br />LS <br />$5,000.00 <br />$5,000.00 <br />Allowance for set-up & coordination. <br />Provisions for staging and storage. <br />1.00 <br />LS <br />$3.000.00 <br />$3,000.00 <br />Mostly from outside, possibly with limited containers. <br />Premiums to maintain a temp. control desk. <br />1.00 <br />LS <br />$10,000.00 <br />$10,000.00 <br />#2/A2.11 allowance, specifics to be addressed. <br />Interior demolition and prep. <br />6.00 <br />MD <br />$960.00 <br />$5,760.00 <br />#2/A2.11, removal of casework, platform, door and misc. <br />New steel fabricated supports. <br />160.00 <br />LF <br />$100.00 <br />$16,000.00 <br />Light HHS columns, headers & bracing as laid out on 1/A8.11. <br />New gage framing and drywall. <br />10.00 <br />MD <br />$1,500.00 <br />$15,000.00 <br />#2/A2.11, A8.11, new platform and fills at enclosure. <br />New security glazing. <br />500.00 <br />SF <br />$120.00 <br />$60,000.00 <br />2/A2.11, 1" thick at walls and lid. <br />Add for security doors & hardware. <br />2.00 <br />Ea <br />$10,000.00 <br />$20.000.00 <br />2/AA2.11, at both sides of new enclosed area. <br />New wall and flooring finishes. <br />1.00 <br />LS <br />$9,000.00 <br />$9,000.00 <br />2/A2.11, painting, flooring and restoration. <br />New custom casework. <br />20.00 <br />LF <br />$800.00 <br />$16,000.00 <br />2/A2.11, custom countertops housing security electronics. <br />Fire sprinkler protection revamping. <br />1.00 <br />LS <br />$6,500.00 <br />$6,500.00 <br />Based on an initial Hultz budget. <br />Electrical revamping. <br />1.00 <br />LS <br />$12,000.00 <br />$12,000.00 <br />Based on an initial BHU budget. <br />Interior restoration, clean-up & pick-up. <br />3.00 <br />MD <br />$960.00 <br />$2,880.00 <br />Allowance for Control Desk work. <br />Add for access & logistics premiums. <br />0.60 <br />LS <br />$181,140.00 <br />$108,684.00 <br />Allowance for working in a secured area. <br />4) New Control Desk, Before G.C. Mark -Ups: <br />$289,824.00 <br />Mobilization. <br />1.00 <br />LS <br />$4,000.00 <br />$4,000.00 <br />Allowance for set-up & coordination. <br />Provisions for staging and storage. <br />1.00 <br />LS <br />$2,000.00 <br />$2.000.00 <br />Outside, mostly in onsite containers. <br />Removal or existing guardrails. <br />3.00 <br />MD <br />$950.00 <br />$2,850.00 <br />Per #4/A2.12, roughly 160 LF. <br />New security mesh panels. <br />1,920.00 <br />SF <br />$50.00 <br />$96,000.00 <br />94/A2.12, roughly 160 LF x 12', pre -finished. <br />Add for supports and backing. <br />320.00 <br />LF <br />$30.00 <br />$9.600.00 <br />Per 94/A2.12, roughly 160 LF, at top and possibly bottom. <br />Painting, restoration and clean-up. <br />4.00 <br />LF <br />$1,000.00 <br />$4,000.00 <br />Allowance at #4/A2.12 work, assumes no new flooring. <br />Add for access & logistics premiums. <br />0.60 <br />LS <br />$118,450.00 <br />$71,070.00 <br />Allowance for working in a secured area. <br />5) New Security Wall @ 2nd or Annex, Before G.C. Mark -Ups: <br />$189,520.00 <br />Mobilization. <br />1.00 <br />LS <br />$1,500.00 <br />$1,500.00 <br />Allowance for set-up & coordination. <br />Provisions for staging and storage. <br />1.00 <br />LS <br />$1,000.00 <br />$1,000.00 <br />Mostly from contractor vans, possibly an onsite container. <br />Prep corridor floors, at basement level. <br />1.350.00 <br />SF <br />$3.00 <br />$4,050.00 <br />#1/A2.10, includes removal of slab surface paint. <br />Prep corridor floors, at first level. <br />1,700.00 <br />SF <br />$3.00 <br />$5,100.00 <br />#1/A2.11, includes removal of existing floor surface paint. <br />Prep corridor floors, at second level. <br />1.600.00 <br />SF <br />$3.00 <br />$4,800.00 <br />#1/A2.12, includes removal of slab surface paint. <br />Clear slab sealer and possible floor base. <br />4.650.00 <br />SF <br />$1,20 <br />$5,580.00 <br />Per #1/A2.10-2 in corridor areas, a standard sealer. <br />Clean-up and pick-up. <br />3.00 <br />MD <br />$940.00 <br />$2,820.00 <br />#1/A2.10-2 allowance in corridor areas. <br />Add for access & logistics premiums. <br />0.50 <br />LS <br />$24,850.00 <br />$12,425.00 <br />Allowance for working in a secured area. <br />6) Clean & <br />Reseal Hallway Floors, Before G.C. Mark -Ups: <br />$37,275.00 <br />Mobilization. <br />1.00 <br />LS <br />$3,000.00 <br />$3,000.00 <br />Allowance for set-up & coordination. <br />Provisions for staging and storage. <br />1.00 <br />LS <br />$2,000.00 <br />$2,000.00 <br />Mostly from contractor vans, possibly an onsite container. <br />Prep corridor ceilings, at basement level. <br />1,350.00 <br />SF <br />$2.80 <br />$3,780.00 <br />#3/A2.10, assumes existing suspended plaster & the ceilings. <br />Prep corridor ceilings, at first level. <br />1,700.00 <br />SF <br />$2.80 <br />$4,760.00 <br />#6/A2.11, assumes existing suspended plaster & the ceilings. <br />Prep corridor ceilings, at second level. <br />1,600.00 <br />SF <br />$2.80 <br />$4,480.00 <br />#8/A2.12, assumes existing suspended plaster & the ceilings. <br />New security suspended tile ceilings. <br />4,650.00 <br />SF <br />$22.00 <br />$102,300.00 <br />Per A2.10-2 in corridor areas, an Armstrong ceiling. <br />Add for mechanical revamping & upgrades. <br />1.00 <br />LS <br />$90,000.00 <br />$90,000.00 <br />At ceiling replacement, based on an initial Hultz budget. <br />Add for electrical revamping & upgrades. <br />1.00 <br />LS <br />$102,500.00 <br />$102,500.00 <br />At ceiling replacement, based on an initial BHU budget. <br />Minor restoration and repainting of walls. <br />4,650.00 <br />SF <br />$5.00 <br />$23,250.00 <br />A2.10-2, allowance in corridor work. <br />Clean-up and pick-up. <br />6.00 <br />MD <br />$950.00 <br />$5,700.00 <br />A2.10-2 allowance in corridor areas. <br />Add for access & logistics premiums. <br />0.50 <br />LS <br />$341,770.00 <br />$170,885.00 <br />Allowance for working in a secured area. <br />7) New Ceilings <br />in Hallways & Booking, Before G.C. Mark -Ups: <br />$512,655.00 <br />JAIL RENOVATION WORK, continues on the next page: <br />For: Knit Designing Community A PRE -DESIGN COST STUDY From: Bill Acker Consulting Services <br />