Draft: 2/13/24 TASK 1 JAIL RENOVATIONS Page 3 of
<br />FOR KITTITAS COUNTY
<br />n-nrt" 111nitl SSA I Fqr_ cnct
<br />JAIL RENOVATION WORK:
<br />(Continued from the previous page.)
<br />Mobilization.
<br />1.00
<br />LS
<br />$2,000.00
<br />$2,000.00
<br />Allowance for set-up & coordination.
<br />Provisions for staging and storage.
<br />1.00
<br />LS
<br />$1,000.00
<br />$1,000.00
<br />Mostly from contractor vans, possibly an onsite container.
<br />Interior demolition and prep.
<br />4.00
<br />MD
<br />$960.00
<br />$3,840.00
<br />#2/A2.10, removal of gage framed security wall & fixtures.
<br />New stainless partition with an access panel.
<br />180.00
<br />SF
<br />$75.00
<br />$13,500.00
<br />Per #2/A2.10, roughly 15 LF with hardening premiums.
<br />Plumbing modifications.
<br />1.00
<br />LS
<br />$6,500.00
<br />$6,500.00
<br />Various plumbing revamping, based on a Hultz budget.
<br />Electrical modifications.
<br />1.00
<br />LS
<br />$6,500.00
<br />$6,500.00
<br />Various electrical revamping, based on a BHU budget.
<br />Interior restoration, clean-up & pick-up.
<br />3.00
<br />MD
<br />$960.00
<br />$2,880.00
<br />Allowance for Janitor & Kitchen renovation work.
<br />Add for access & logistics premiums.
<br />0.50
<br />LS
<br />$36,220.00
<br />$18,110.00
<br />Allowance for working in a secured area.
<br />3) 19tchen & Janitor Room Modifications, Before G.C.
<br />Mark -Ups:
<br />$54,330.00
<br />Mobilization.
<br />1.00
<br />LS
<br />$5,000.00
<br />$5,000.00
<br />Allowance for set-up & coordination.
<br />Provisions for staging and storage.
<br />1.00
<br />LS
<br />$3.000.00
<br />$3,000.00
<br />Mostly from outside, possibly with limited containers.
<br />Premiums to maintain a temp. control desk.
<br />1.00
<br />LS
<br />$10,000.00
<br />$10,000.00
<br />#2/A2.11 allowance, specifics to be addressed.
<br />Interior demolition and prep.
<br />6.00
<br />MD
<br />$960.00
<br />$5,760.00
<br />#2/A2.11, removal of casework, platform, door and misc.
<br />New steel fabricated supports.
<br />160.00
<br />LF
<br />$100.00
<br />$16,000.00
<br />Light HHS columns, headers & bracing as laid out on 1/A8.11.
<br />New gage framing and drywall.
<br />10.00
<br />MD
<br />$1,500.00
<br />$15,000.00
<br />#2/A2.11, A8.11, new platform and fills at enclosure.
<br />New security glazing.
<br />500.00
<br />SF
<br />$120.00
<br />$60,000.00
<br />2/A2.11, 1" thick at walls and lid.
<br />Add for security doors & hardware.
<br />2.00
<br />Ea
<br />$10,000.00
<br />$20.000.00
<br />2/AA2.11, at both sides of new enclosed area.
<br />New wall and flooring finishes.
<br />1.00
<br />LS
<br />$9,000.00
<br />$9,000.00
<br />2/A2.11, painting, flooring and restoration.
<br />New custom casework.
<br />20.00
<br />LF
<br />$800.00
<br />$16,000.00
<br />2/A2.11, custom countertops housing security electronics.
<br />Fire sprinkler protection revamping.
<br />1.00
<br />LS
<br />$6,500.00
<br />$6,500.00
<br />Based on an initial Hultz budget.
<br />Electrical revamping.
<br />1.00
<br />LS
<br />$12,000.00
<br />$12,000.00
<br />Based on an initial BHU budget.
<br />Interior restoration, clean-up & pick-up.
<br />3.00
<br />MD
<br />$960.00
<br />$2,880.00
<br />Allowance for Control Desk work.
<br />Add for access & logistics premiums.
<br />0.60
<br />LS
<br />$181,140.00
<br />$108,684.00
<br />Allowance for working in a secured area.
<br />4) New Control Desk, Before G.C. Mark -Ups:
<br />$289,824.00
<br />Mobilization.
<br />1.00
<br />LS
<br />$4,000.00
<br />$4,000.00
<br />Allowance for set-up & coordination.
<br />Provisions for staging and storage.
<br />1.00
<br />LS
<br />$2,000.00
<br />$2.000.00
<br />Outside, mostly in onsite containers.
<br />Removal or existing guardrails.
<br />3.00
<br />MD
<br />$950.00
<br />$2,850.00
<br />Per #4/A2.12, roughly 160 LF.
<br />New security mesh panels.
<br />1,920.00
<br />SF
<br />$50.00
<br />$96,000.00
<br />94/A2.12, roughly 160 LF x 12', pre -finished.
<br />Add for supports and backing.
<br />320.00
<br />LF
<br />$30.00
<br />$9.600.00
<br />Per 94/A2.12, roughly 160 LF, at top and possibly bottom.
<br />Painting, restoration and clean-up.
<br />4.00
<br />LF
<br />$1,000.00
<br />$4,000.00
<br />Allowance at #4/A2.12 work, assumes no new flooring.
<br />Add for access & logistics premiums.
<br />0.60
<br />LS
<br />$118,450.00
<br />$71,070.00
<br />Allowance for working in a secured area.
<br />5) New Security Wall @ 2nd or Annex, Before G.C. Mark -Ups:
<br />$189,520.00
<br />Mobilization.
<br />1.00
<br />LS
<br />$1,500.00
<br />$1,500.00
<br />Allowance for set-up & coordination.
<br />Provisions for staging and storage.
<br />1.00
<br />LS
<br />$1,000.00
<br />$1,000.00
<br />Mostly from contractor vans, possibly an onsite container.
<br />Prep corridor floors, at basement level.
<br />1.350.00
<br />SF
<br />$3.00
<br />$4,050.00
<br />#1/A2.10, includes removal of slab surface paint.
<br />Prep corridor floors, at first level.
<br />1,700.00
<br />SF
<br />$3.00
<br />$5,100.00
<br />#1/A2.11, includes removal of existing floor surface paint.
<br />Prep corridor floors, at second level.
<br />1.600.00
<br />SF
<br />$3.00
<br />$4,800.00
<br />#1/A2.12, includes removal of slab surface paint.
<br />Clear slab sealer and possible floor base.
<br />4.650.00
<br />SF
<br />$1,20
<br />$5,580.00
<br />Per #1/A2.10-2 in corridor areas, a standard sealer.
<br />Clean-up and pick-up.
<br />3.00
<br />MD
<br />$940.00
<br />$2,820.00
<br />#1/A2.10-2 allowance in corridor areas.
<br />Add for access & logistics premiums.
<br />0.50
<br />LS
<br />$24,850.00
<br />$12,425.00
<br />Allowance for working in a secured area.
<br />6) Clean &
<br />Reseal Hallway Floors, Before G.C. Mark -Ups:
<br />$37,275.00
<br />Mobilization.
<br />1.00
<br />LS
<br />$3,000.00
<br />$3,000.00
<br />Allowance for set-up & coordination.
<br />Provisions for staging and storage.
<br />1.00
<br />LS
<br />$2,000.00
<br />$2,000.00
<br />Mostly from contractor vans, possibly an onsite container.
<br />Prep corridor ceilings, at basement level.
<br />1,350.00
<br />SF
<br />$2.80
<br />$3,780.00
<br />#3/A2.10, assumes existing suspended plaster & the ceilings.
<br />Prep corridor ceilings, at first level.
<br />1,700.00
<br />SF
<br />$2.80
<br />$4,760.00
<br />#6/A2.11, assumes existing suspended plaster & the ceilings.
<br />Prep corridor ceilings, at second level.
<br />1,600.00
<br />SF
<br />$2.80
<br />$4,480.00
<br />#8/A2.12, assumes existing suspended plaster & the ceilings.
<br />New security suspended tile ceilings.
<br />4,650.00
<br />SF
<br />$22.00
<br />$102,300.00
<br />Per A2.10-2 in corridor areas, an Armstrong ceiling.
<br />Add for mechanical revamping & upgrades.
<br />1.00
<br />LS
<br />$90,000.00
<br />$90,000.00
<br />At ceiling replacement, based on an initial Hultz budget.
<br />Add for electrical revamping & upgrades.
<br />1.00
<br />LS
<br />$102,500.00
<br />$102,500.00
<br />At ceiling replacement, based on an initial BHU budget.
<br />Minor restoration and repainting of walls.
<br />4,650.00
<br />SF
<br />$5.00
<br />$23,250.00
<br />A2.10-2, allowance in corridor work.
<br />Clean-up and pick-up.
<br />6.00
<br />MD
<br />$950.00
<br />$5,700.00
<br />A2.10-2 allowance in corridor areas.
<br />Add for access & logistics premiums.
<br />0.50
<br />LS
<br />$341,770.00
<br />$170,885.00
<br />Allowance for working in a secured area.
<br />7) New Ceilings
<br />in Hallways & Booking, Before G.C. Mark -Ups:
<br />$512,655.00
<br />JAIL RENOVATION WORK, continues on the next page:
<br />For: Knit Designing Community A PRE -DESIGN COST STUDY From: Bill Acker Consulting Services