Draft: 2113/24 TASK 1 JAIL RENOVATIONS Page 1 of <br />FOR KITTITAS COUNTY <br />GENERAL SCOPE: <br />This is a cost estimate to provide a laundry list of improvements at the Kittitas County Jail in Ellensburg, WA Each of the Base Estimate <br />items listed below for estimating purposes is intended to act as its own independent project. However, which combination of scope items <br />ultimately is selected is figured to be done at the same time and under the same contract. Estimate costs and scope information available <br />are very preliminary and should be treated as such. The Item #9 Fire Sprinkler Protection Replacement is perhaps the cost item with the <br />greatest potential cost swing, as the extent of required ceiling and wall cut & patch and other restoration work required, including mechanical <br />& electrical revamping, is still to be determined. <br />The estimate includes construction full costs. A 35% estimate composite mark-up is figured, intended to cover general contractor's general <br />requirements, overhead & profit, bond & insurance, sales tax on materials, independent 3rd party testing, B & O tax, and about combined <br />10% design and minor construction cost escalation contingency. In addition, logistical premiums are included for working in a secured <br />facility. Sales tax and other soft costs, such as permitting, design fees, a change order contingency, and owner's administration & moving <br />costs are not included. Field work is assumed to start in the third quarter of 2024, roughly six months from the time of this estimate. If <br />actual field work does not end up starting by the end of this year, it is suggested an additional construction cost escalation premium be <br />considered. <br />INCLUDED: <br />Premiums for working within an occupied facility. <br />A scope of improvements as listed below. <br />Cuts, patches and restoration as deemed applicable. <br />Some security construction hardening premiums where noted. <br />Temporary access detouring at main entry work and where else required. <br />A combined 10% design and cost escalation contingency. <br />EXCLUDED: <br />Premiums for an accelerated project schedule, or odd shift hours. <br />Work in existing areas beyond what is listed. <br />Hazardous material abatement —assumed to be not applicable. <br />New security related systems. <br />Temporary relocation of inmates and personnel. <br />Accelerated project schedule premiums. <br />Contractor's general requirements, overhead & profit, and sales tax on materials. Permits, design fees, and sales tax beyond that on materials. <br />Contractor's bond & insurance, B & O tax, and independent testing. Owner administration costs, or a temporary field construction office. <br />Premiums for working in a secured operating facility. A project change order contingency, or significant cost escalation. <br />ETARY COST ESTIMATE <br />PROJECT COMPONENT <br />Quanti <br />Unit <br />Estimate <br />Cost <br />Fzz: <br />REMARKS <br />JAIL RENOVATION BASE ESTIMATE BREAKDOWN: <br />Tax. <br />Includes Contractor G.R, OH&P, B&I, B&O Tax & ContinE <br />enc ark -Ups, No Sales <br />1) Replace HVAC Rooftop Unit at Jail Annex. <br />1.35 <br />LS <br />$564,300 <br />$761,805 <br />See Page 2 for detailed cost breakdowns. <br />2) Exterior Fagade Improvements. <br />1.35 <br />LS <br />$1,587,304 <br />$2,142,860 <br />3) Kitchen & Janitor Room Modifications. <br />1.35 <br />LS <br />$54,330 <br />$73,346 <br />See Page 3 for detailed cost breakdowns. <br />4) New Control Desk. <br />1.35 <br />LS <br />$289,824 <br />$391,262 <br />5) New Security Wall at 2nd Floor Annex. <br />1.35 <br />LS <br />$189,520 <br />$255,852 <br />6) Clean & Reseal Hallway Floors. <br />1.35 <br />LS <br />$37,275 <br />$50,321 <br />7) New Ceilings in Hallways & Booking. <br />1.35 <br />LS <br />$512,655 <br />$692,084 <br />" <br />8) Miscellaneous Repairs. <br />1.35 <br />LS <br />$384,100 <br />$618,535 <br />See Page 4 for detailed cost breakdowns. <br />9) Fire Sprinkler Protection Replacement. <br />1.35 <br />LS <br />$1,844,655 <br />$2,490,284 <br />JAIL RENOVSATION BASE ESTIMATE MACC: <br />$5,463,963 <br />$7 376,350 <br />OPTION: <br />Replace Rec Yard Topping & Drains. <br />2,250.00 <br />SF <br />$80.00 <br />$243,000 <br />A net premium over Base Estimate Rec Yard work in Item #2. <br />For: Knit Designing Community A PRE -DESIGN COST STUDY From: Bill Acker Consulting Services <br />