Laserfiche WebLink
ESTIMATED <br />;• DESCRIPTION <br />AREA <br />COSTIS.F. <br />TOTAL <br />CONSTRUCTION <br />COST <br />Government = 68,283 SF <br />Government = 5001SF <br />34,141.500 <br />Courts = 57.612 SF <br />Courts = 6501SF <br />37,447,800 <br />Build courthouse, government building, jail facility along with <br />I <br />Jail = 111,449 SF <br />Jail = 950ISF <br />105,876,550 <br />storage, and sheriff building at site adjacent to the Airport in <br />Kittitas County. Develop site for civic plazalgreen space, <br />required utilities and on -grade parking accommodations. On- <br />grade parking estimated at 900 stalls <br />Sheaf Building = 39,575 SF <br />Sheriff Building = 5001SF <br />19,787,500 <br />293,940,936 <br />(including soft cost: <br />382,123,217) <br />Sitework = 3445,823 SF <br />Parking on -grade = 900 <br />Sitework = 24/SF <br />8,299,752 <br />Demolish Existing <br />WA <br />NIA <br />Government = 68.283 SF <br />Government = 5001SF <br />34,141,500 <br />Courts = 57.612 SF <br />Courts = 650/SF <br />37,447,800 <br />Build courthouse and government building at site adjacent to <br />the Airport in Kittitas County. Develop site for civic plaza/green <br />space, required utilities and on -grade parking <br />Jail & Sheriff = Future <br />WA <br />N/A <br />100,131,927 <br />Sitework = 3 = SF 900 <br />parking on -grade <br />Sitework = 24/SF <br />8,299,752 <br />accommodations. Jail facility along with storage, and sheriff <br />building to be future build -outs at Airport site. On -grade parking <br />(including soft cost <br />' 32,392,513) <br />estimated at 900 stalls <br />Demolish Existing <br />NIA <br />NIA <br />Build courthouse and sheriff building at existing downtown site. <br />Exisitng Jail to remain. Upgrade utilties. Build parking structure <br />Govemment = 68,283 SF <br />Courts = 57,612 SF <br />Government = 500/SF <br />Courts = 6501SF <br />34,141.500 <br />37,447,800 <br />Jail = Existinq <br />Sheriff Building = 39,575 SF <br />Jail = NIA <br />Sheriff Building = 5001SF <br />NIA <br />19.787,500 <br />on the site to the north of the existing courthouse. New jail <br />facility to be future build -outs on separate site. Government <br />building and storage to be located on site adjacent to the <br />Airport. Develop site for green space, required utilities and on- <br />grade parking accommodations. On -grade &parking structure <br />150,752,894 <br />(including soft cost: <br />195,978.762) <br />Sitework = 219.596 SF <br />Parkin Structure = 278 stalls <br />g <br />Sitework = 24/SF <br />Partin Structure = 30k/stall <br />9 <br />5,270,304 <br />8,340,000 <br />stalls estimated to be 380 stalls at Downtown site. Airport site <br />to have on -grade parking estimated at 375 stalls. <br />Demolish Existing = 43,450 SF <br />Demolish Existing = 10/SF <br />434.500 <br />Government = 68,283 SF <br />Government = 500ISF <br />34,141,500 <br />Courts = 57,612 SF <br />Courts = 650/SF <br />37,447,800 <br />Build courthouse and government building on existing <br />downtown site. Develop site and required utilities. Build <br />multiple parking structures on sites downtown to accommodate <br />Jail & Sheriff = Future <br />WA <br />NIA <br />126,558,546 <br />Sitework = 24.000 SF <br />Parking Structure = 518 stalls <br />Sitework = 241SF <br />Parking Structure = 30k/stall <br />576,000 <br />15,540.000 <br />parking needs. Jail accommodations to be resourced out to <br />separate facility. On -grade & parking structure stalls estimated <br />(including soft cost <br />164,526.110) <br />to be 530 stalls. <br />Demolish Existing & Jail = <br />79,718 SF <br />Demolish Existing = 10iSF <br />797,180 <br />Interior remodel for existing courthouse. Existing Court exterior <br />to remain. Exisitng Jai! to remain. Build parking structure on the <br />Government = 68.283 SF <br />Remodel Courts = 43,450 SF <br />Government = 500ISF <br />Remodel Courts = 4001SF <br />34,141,500 <br />17,380,000 <br />Jail = Existing <br />Jail =NIA <br />N/A <br />site to the north of the existing courthouse to accommodate <br />• + Court parking. Government and Sheriff !building to be located <br />on site adjacent to the Airport. Develop site for green space, <br />required utilities and on -grade parking accommodations. On- <br />grade & parking structure stalls estimated to be 380 stalls at <br />Downtown site. Airport site to have on -grade parking estimates <br />at 375 stalls <br />Sheriff Building = 39,575 SF <br />Sheriff Building = 500ISF <br />i9,787,500 <br />121,434,605 <br />(including soft costs: <br />5 R <br />1�7,86 Q86) <br />Sitework = 219,596 SF <br />Parkin Structure = 278 stalls <br />g <br />Sitework = 241SF <br />Parkin Structure = 30klstali <br />g <br />5,270,304 <br />8,340.000 <br />Demolish Existing <br />(Cost included in Remodel) <br />NIA <br />NIA <br />POTENTIAL SITE OPTIONS AND <br />PROPOSED PROJECT COSTS <br />NOTES: <br />Cos, shown �bo e an•-, inclades ccw'smuctior) costs <br />(Z Cos., s. iown .stxNv? .`.SOBS noel iotclude [arid a,Cquisilioli Kittitas County <br />D AF T PRE -DESIGN REPORT JUNE 14, 2022, Revised June 22, 202'2 27 <br />