Laserfiche WebLink
2024 Maintenance Rock Materials <br />Bid Opening February 22,2024, at 2:00 p.m. <br />SCHEDULE 'B' <br />Vendor to Provide Labor and Equipment to Load Materiats <br />1 6,000 Ellensburg BST Crushed Surfacing 1/2 to No. 4 <br />Ellensbu Gement Products <br />$1s.00 $78,000.00 <br />2 8,000 East Kittitas BST Crushed Surfaci 1/2 to No. 4 $13.00 $104,000.00 <br />3 6,500 Cle Elum BST Crushed Su 1/2 to No. 4 $13.00 $84,500.00 <br />4 3,500 Ellensburg BST Crushed Surfacin 3/8 to No. 1 $16.75 $58,625.00 <br />5 1,600 Cle Elum BST Crushed 3/8 to No. 1 $16.75 800.00 <br />6 4.000 Ellensburg Maintenance Sand $11.30 $45,200.00 <br />7 4,000 Cle Elum Maintenance Sand $11.30 $45 .00 <br />8 1,000 Ellensburg <br />1 1/4" Crushed Surfacing Base <br />Course $11.00 $11 000.00 <br />I 1,000 Cle Elum <br />1 1/4" Crushed Surfacing Base <br />Course $11.00 $11,000.00 <br />10 2,000 Ellensburg 5/S" Crushed Surfacing Top Course $11.10 .00 <br />11 2,000 Cle Elum 5/8" Crushed T Course $1 1 .10 $22 00.00 <br />12 1,000 Ellensburg 21l2" Ballast $10.75 $10,750.00 <br />13 1,000 Cle Elum 2112" Ballast $10.75 $10,750.00 <br />Subtotal before Tax -225.00 <br />SALES TAX -8.10o/o 948.23 <br />TotalSchedule "8" -$573,173.23 <br />SCHEDULE "8"