Laserfiche WebLink
2024 LIQUID ASPHALT <br />BID OPENING <br />February 22,2024 @ 2:00 p.m. <br />Total Bid <br />1 <br />172.30 <br />$19,586.15 <br />$1.556.670.9s <br />$0.00 <br />$1 .1 88.260.0C <br />$297,065.00 <br />s39.172.30 <br />$19,586.15 <br />$239,666.00 <br />91 <br />$0.00 <br />$1.843.665.9s <br />Total Unit <br />Price <br />$s99.17 <br />$599.17 <br />$391.72 <br />$391,72 <br />ln State - Price to include Haz. Tax <br />Not includinq Haz. Subsiance Tax <br />$594.13 <br />$594.13 <br />$391.72 <br />$391.72 <br />$599.17 <br />$599.17 <br />Albina Asphaltl <br />801 Main Street <br />Vancouver, WA 98660 <br />Haz, Tax <br />$4.17 <br />$4.17 <br />$2.72 <br />$2.72 <br />$10,820.95 <br />$4.13 <br />$4.13 <br />$2.72 <br />$2.72 <br />$4.17 <br />$4.17 <br />$ 12.815.95 <br />Unit Prics <br />$595.00 <br />$595.00 <br />$389.00 <br />$389.00 <br />$1.545.850.00 <br />$590.00 <br />$590.00 <br />s389.00 <br />$389.00 <br />$595.00 <br />s595.00 <br />$1 <br />Total Bid <br />$1,274,000.00 <br />$318,500.00 <br />$48.700.00 <br />$24,350.00 <br />$1,665,550.00 <br />$0.00 <br />$1,665,550.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$250,800.00 <br />$62,700.00 <br />$3r3,500.00 <br />$0.00 <br />$313,500.00 <br />Ergon Asphalt and Emulsions Notes: <br />Cancellations may be subject to fees for toss of truck operation plus g3OO.OC <br />restocking fee for loads already loaded. Product retum - g3O0.0O per load- <br />No credit given for diluted material or antistrip. Retum freight - Full charge <br />lo destination and 1/2 freight back witt be charged. DemurEge - $140.00 <br />(Fi6t 2 Hours Free). Most Delivery Trucks/TraiteE are not set up to pump <br />croduct. Please inquire for cost if needed- <br />Total Unit <br />Price <br />$637.00 <br />$637.00 <br />$487.00 <br />$487.00 <br />ln State - Price to include Haz. f ax <br />Not including Haz. Substance Tax <br />$627.00 <br />$627.00 <br />Ergon Asphalt and Emulsions <br />3152 Selph Landing Road <br />Pasco, WA 99301 <br />Haz. Tax <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />s0.00 <br />$ <br />Unit Price <br />$637.00 <br />$637.00 <br />$487.00 <br />$487.00 <br />$1.665.550.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$627"00 <br />$627.00 <br />$ 313.500.00 <br />Total Bid <br />$1.340.000.00 <br />$335.000.00 <br />$59,500.00 <br />$29.750.00 <br />$1.764.250.00 <br />$12,349.75 <br />s0.00 <br />$1.776.599.7s <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$268.000.00 <br />s67.000.00 <br />$335.000.00 <br />$13,156.50 <br />$0.00 <br />$348.156.s0 <br />Total Unit <br />Price <br />$670.00 <br />$670.00 <br />$595.00 <br />$595.00 <br />Cut of State - Plus Haz. Tax <br />\ot includinq Haz. Substance Tax <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$670.00 <br />$670.00 <br />ldaho Asphalt Supply, lnc <br />16425W. Prairie Ave. <br />Hauser, lD 83854 <br />Haz. Tax <br />$0.00 <br />$ <br />Unit Pdce <br />$670.00 <br />$670.00 <br />$595.00 <br />$595.00 <br />$1,764,2s0.00 <br />s0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$670.00 <br />$670.00 <br />$ 335.000.00 <br />atv' <br />Tons <br />Tons <br />Tons <br />Tons <br />Tons <br />Tons <br />Tons <br />Tons <br />Tons <br />Tons <br />2000 <br />500 <br />100 <br />50 <br />O.70o/o <br />2000 <br />500 <br />100 <br />50 <br />400 <br />100 <br />O.70o/o <br />Product <br />CRS-2P - Lo. Countv <br />CRS-2P - Up. Countv <br />3SS - 1 50% Dil. - Lo. Countv <br />3SS - 1 50% Dil. - Uo, Countv <br />Subtotal <br />Haz. Sub. Tax- <br />WA St. Sales Tax- <br />Total Schedule "A" - <br />HFRS-P1 - Lo. Couniv <br />HFRS-PI - Up. Countv <br />HFRS-P1 50% Dil. - Lo. County <br />HFRS-Pl 50% Dil. - Up. Countv <br />HFE-1 50 - Lower County <br />HFE-1 50 - Upper Countv <br />Subtotal <br />Haz. Sub. Tax- <br />WA St. Sales Tax- <br />Total Schedule'B- -