Laserfiche WebLink
2024 Maintenance Rock Materials <br />Bid Opening February 22, 2024, at 2:00 p.m. <br />SCHEDULE 'B' <br />Vendor to Provide Labor and Equipment to Load Materials <br />ITEM <br />NO. <br />ESTIMATED <br />QUANTITY <br />(In TONS) <br />Location <br />ITEM DESCRIPTION <br />Ellensburg Cement Products <br />PRICE PER TON TOTAL PRICE <br />1 <br />6,000 <br />Ellensburg <br />BST Crushed Surfacing 1/2 to No. 4 <br />$13.00 <br />$78,000.00 <br />2 <br />8,000 <br />East Kittitas <br />BST Crushed Surfacing 1/2 to No. 4 <br />BST Crushed Surfacing 112 to No. 4 <br />BST Crushed Surfacing 3/8 to No. 10 <br />$13.00 <br />$104,000.00 <br />$84,500.00 <br />3 <br />4 <br />6,500 <br />_3,500 <br />Cle Elum <br />Ellensburg <br />$13.00 <br />$16.75 <br />$58,625.00 <br />5 <br />1,600 <br />Cle Elum <br />BST Crushed Surfacing 3/8 to No. 10 <br />$16.75 <br />$26,800.00 <br />6 <br />4,000 <br />Ellensburg <br />Maintenance Sand <br />$11.30 <br />$45,200.00 <br />7 <br />8 <br />9 <br />10 <br />4,000 <br />Cie Elum <br />Maintenance Sand <br />$11.30 <br />$11.00 <br />$45,200.00 <br />$11,000.00 <br />$11,000.00 <br />$22,200.00 <br />1,000 <br />1,000 <br />2,000 <br />Ellensburg <br />Cle Elum <br />Ellensburg <br />1 1/4" Crushed Surfacing Base <br />Course <br />1 1/4" Crushed Surfacing Base <br />Course <br />5/8" Crushed Surfacing Top Course <br />$11.00 <br />$11.10 <br />11 <br />2,000 <br />Cle Elum <br />5/8" Crushed Surfacing Top Course <br />2 1/2" Ballast <br />$11.10 <br />$22,200.00 <br />$10,750.00 <br />$10,750.00 <br />$530,225.00 <br />$42,948.23 <br />12 <br />1,000 <br />Ellensburg <br />$10.75 <br />13 <br />1,000 <br />Cle Elum <br />2 1/2" Ballast <br />$10.75 <br />Sub -total before Tax - <br />SALES TAX - <br />8.10% <br />Total Schedule "B" - <br />$573,173.23 <br />SCHEDULE "B" <br />