My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA Safety Kleen
>
Meetings
>
2024
>
02. February
>
2024-02-06 10:00 AM - Commissioners' Agenda
>
PSA Safety Kleen
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 1:18:20 PM
Creation date
2/13/2024 1:18:05 PM
Metadata
Fields
Template:
Meeting
Date
2/6/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Professional Service Agreement with Safety Kleen for Used Oil and Antifreeze Recycling Services
Order
6
Placement
Consent Agenda
Row ID
114122
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
income, or personel property to which the County does not hold title. The County is <br />exempt from Federal Excise Tax. <br />10. Regulations and Requirement: <br />This Agreement shall be subject to all laws, rules and regulations of the United States of <br />America, and State of Washington, and political subdivisions of the State of Washington, <br />and to any other provisions set forth herein or in the attached exhibits. <br />11. Right to Reyiew: <br />This contract is subject to review by any Federal or State auditor. The Coung or its <br />designee shall have the right to review and monitor the financial and service components <br />of this program by whatever means are deemed expedient by the County. Such review <br />may occur with or wiihout notice, and may include, but is not limited to, on-site inspection <br />by County agents or employees, inspection of all records or other materials which the <br />County deems pertinent to the Agreement and its performance, and any and all <br />communications with or evaluation by service recipients under this Agreement. The <br />Contractor shall preserve and maintain all financial records and records relating to the <br />performance of work under this Agreement for 6 years after contract termination, and shall <br />make them available for such review, within Kittitas County, State of Washington, upon <br />request. <br />12. Modifications: <br />12.1 Either party may request changes in the Agreement. Any and all agreed <br />modifications shall be in writing, signed by each of the parties. <br />12.2 The County may, at any time, by written notice thereof to Contractor <br />("Change Notice") makes changes in the Work within the general scope of <br />this Agreement, including, but not limited to: (a) changes in, revisions to, <br />substitutions for, additions to or deletions of any Work; (b) changes in <br />schedule; and (c) acceleration, deceleration or suspension of performance <br />of any Work. <br />12.3 lf any change in the Work causes an increase or decrease on Contractor's <br />cost of, or the time required for, performance of the Work, an equitable <br />adjustment in the compensation to Contractor and in the schedule for the <br />performance of the Work shall be made to reflect such an increase or <br />decrease. <br />12.4 Notwithstanding any dispute or delay in arriving at a mutually acceptable <br />equitable adjustment, Contractor shall proceed in accordance with all <br />Change Notices. Contractor must, within thirty (30) days afier receipt of any <br />Change Notice that does not set forth any acceptable adjustment, submit to <br />the Coun$ a written statement setting forth any adjustment claimed. <br />Professional Services Agreement (rev. ggl24n01 8) <br />Page 5 of 19
The URL can be used to link to this page
Your browser does not support the video tag.