Laserfiche WebLink
EXHIBIT "A" <br />SCOPE OF WORK <br />ln addition to providing all material and labor, the Contractor shall perform the following: <br />1. Contractor shall pick up and recycle or dispose of lead acid batteries received by the <br />County. <br />2. Contractor shall provide a truck within 5 days of notification by the County that pick-up <br />services are needed. <br />3. Contractor will remove lead batteries from either of the county designated collection <br />locations in Cle Elum, and Ellensburg, Washington. <br />4. Contractor shall recycle or properly dispose of all lead acid batteries received from the <br />County in accordance with allfederal and state laws. <br />County shall provide Contractor weighing services for all shipments leaving <br />County locations. Contractor shallweigh in empty on site and weigh out after <br />receiving prepared shipment. <br />Q.UnCq no clrcumslanqgs shall arly oI the lead acid batteries hauled from a County <br />Solid Waste facility be disposed of irnlawfully by the Contractor. <br />Pnofessional Services Agreement (rev. 09/241201 8) <br />Page 14 of 19 <br />5.