Laserfiche WebLink
KITTITAS COUNTY <br />BID PROPOSAL <br />SCHEDULE C <br />FURNISH MAINTENANCE ROCK FOR 2024 <br />VENDOR TO PROVIDE LABOR AND EQUIPMENT TO LOAD MATERIALS <br />ITEM <br />NO. <br />ESTIMATED <br />QUANTITY <br />ITEM <br />DESCRIPTION <br />PRICE <br />PER TON <br />TOTAL <br />PRICE <br />15 <br />Per Ton <br />(Ellensburg) <br />Select Borrow <br />$ <br />$ <br />16 <br />Per Ton <br />(Cie Elum) <br />Select Borrow <br />$ <br />$ <br />17 <br />Per Ton <br />(Ellensburg) <br />Light Loose Riprap <br />$ <br />$ <br />18 <br />(ClerTon Elum) <br />Light Loose Riprap <br />$ <br />$ <br />19 <br />Per Ton <br />(Ellensburg) <br />Quarry Spells <br />$ <br />$ <br />20 <br />(ClerElum Ton <br />Quarry Spalls <br />$ <br />$ <br />Washington State Sales Tax <br />TOTAL <br />$ <br />Maintenance Rock 2024 Page 12 <br />