Laserfiche WebLink
Kittitas County Public Works <br />as of January 26, 2024 <br />Road: <br />Fees for Planning Services <br />Current Fee <br />Fees with set hours will be billed monthly for additional time as needed at $243/hr. <br />Access Permit <br />437.00 <br />Address Permit w/plate <br />183.00 <br />Alternative Energy Application/Review (8 hrs included) <br />1,944.00 <br />Building Move Permit <br />900.00 <br />Franchise Fee (6hrs included)) <br />1,615.00 <br />Haul Route Permit (3 hrs included)) <br />750.00 <br />Land Use Permit (5 hrs included)) <br />1,215.00 <br />(Plats, Boundary Lines, Conditional Use, Grading, Lots, Rezoning, Site Plans, Civil Reviews, Other) <br />Lot Consolidation <br />586.00 <br />On System County Road Establishment <br />3,770.00 <br />Over Weight/Super load <br />750.00 <br />Preliminary Site Analysis/meeting <br />220.00 <br />Private Bridge/Road Inspection (Shrs included)) <br />1,944.00 <br />Private Road Name Establishment <br />750.00 <br />Road Certification <br />1,095.00 <br />Road Standard Variance <br />1,075.00 <br />Administrative Variance Appeal <br />1,944.00 <br />Road Vacate <br />3,888.00 <br />Road Closure Requests <br />972.00 <br />Right of Way <br />850.00 <br />Sepa (2 hrs included)) <br />950.00 <br />Land Use Variance(s) <br />500.00 <br />Road Sign Review <br />243.00 <br />Transportation Concurrency (12hrs included)) <br />3,690.00 <br />Vehicle Towing <br />972.00 <br />Road: <br />Sales: Current Fee <br />Road Atlas <br />Address Plate <br />30.00 <br />61.00 <br />Flood Control: <br />Sales: <br />Current Fee <br />Flood Plain Management Permit (4hrs included, billed monthly for cost exceeding 4 hrs) <br />970.00 <br />CLOMR Permit (8 hrs included, billed monthly for cost exceeding 8 hrs) <br />1,940.00 <br />Flood Development Permit (Propane Tank, Solar Panels, Other) <br />120.00 <br />Shoreline Permit <br />550.00 <br />Water Resource: <br />Mitigation and Metering Program Fees <br />Current Fee <br />Water Mitigation Package A <br />3,895.00 <br />Water Mitigation Package B <br />4,810.00 <br />Water Mitigation Package C (Cisterns) <br />2,780.00 <br />Water Metering Annual Fee <br />180.00 <br />Meter Inspection Fee (Non -County water) <br />370.00 <br />Water Budget Neutral Determination (Non -County Water outside Upper County Rule Area, 1 hr included, <br />billed monthly for costs exceeding 1 hr) <br />120.00 <br />NOTE: Affordable housing proposal sponsored by the Board of County Commissioners shall have Public works fees <br />automatically waived from this fee schedule. <br />