My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-01-09-minutes-solid-waste-and-maintenance
>
Meetings
>
2024
>
01. January
>
2024-01-16 10:00 AM - Commissioners' Agenda
>
2024-01-09-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 12:26:19 PM
Creation date
1/11/2024 12:22:32 PM
Metadata
Fields
Template:
Meeting
Date
1/16/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
113090
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional discussions with the City identified concerns with the sidewalk condition. The City offered <br />several cost sharing options for partnering with the County to establish the bus stop, repair the sidewalk <br />and optionally repair/replace the concrete retaining wall. The original budgeted amount for this project <br />(which didn't include the bus stop or retaining wall) was $175k. With the City's cost sharing proposals, <br />the county stands to complete the full scope of work (including retaining wall) and divest itself of future <br />sidewalk maintenance responsibilities for >$160K. <br />Option 1 - Paverstone Installation <br />6' Wide Paverstone Wallcuay, r Wide Concrete Retaining Strips, 7' Wide Rods limed Planter Strip with Trees <br />Bid Rem No. j Spec Section; Bid Item - <br />Unk <br />i Qaarrtityi Unit Pace j <br />Total <br />1 <br />;Minor Change <br />EST; <br />11; $ 7,500.00 1 <br />$ <br />7,5W.00 <br />--_ <br />2 j <br />_1.04 <br />109 <br />- -- --_ <br />Mobilization <br />l5 <br />; 1 $ 15,000.00 <br />$ <br />15,000.00 j <br />3 <br />110 <br />_ _ <br />I Projed Temporary Traffic Control <br />LS <br />i 1 $ 5,000.00 <br />1 $ <br />5,000.00 <br />4 ; <br />2-01 <br />Clearing and Grubbing <br />LS <br />j 1 $ 5,000.00 $ <br />5,000.00 <br />5 <br />2-02 SP <br />i Remove Cement Conc. Sidewalk <br />j SY <br />1 2501 $ 20.001 $ <br />5,000.00 <br />6 <br />2-12 <br />!Construction Geotextilefor Separation <br />j Sy <br />I 200 $ 3.001 $ <br />600.00 <br />7 <br />4.04 <br />' Crushed Surfaa T Course <br />` Surfacing Top <br />! TN <br />301 $ 75.00 j $ <br />2 $ 20D.00 $ <br />2,250.00 <br />400.00 <br />8 <br />9 <br />_ _ <br />8-01 <br />8-02 SP <br />Eron/Water Pollution Control <br />Plant Selection Flowering Cherry "Royal Burgundy" <br />j EA <br />; EA <br />7_$ _ 1,250.00 j $ <br />8,750.00 <br />10 <br />8-02 SP <br />Clean Fractured Rode 2" -4' <br />TN <br />60 $ 60.00 $ <br />3,600.001 <br />11 <br />j 8-03SP <br />irrigation System <br />LS <br />1 $ 5,000.OD $ <br />5,00M <br />12 <br />8-04 <br />`Cement Conc. Traffic Curb and Gutter <br />; LF <br />j 15 . $ 75.00 <br />L$ <br />1,125.001 <br />13 <br />8.14 <br />;Cement Conc. Sidewalk Retaining Strips <br />! Sy <br />I 60 $ 80.00 <br />1 $ <br />4,800.00 11 <br />14 <br />8-14 <br />! Brick Paver Sidewalk <br />SY <br />! 150 $ 200.00 <br />! $ <br />30 000�.0D <br />15 <br />8-14 <br />! Brick Paver Decorative Patters <br />EA <br />8 $ 175.00 <br />1 $ <br />1; W.W i <br />16 <br />B-14 <br />Detectable Waring Surface <br />! SF <br />24 $ 60.OD <br />$ <br />1,440.00 <br />17 <br />j B-20 SP <br />j Illumination System - Historic 3 Globe Poles <br />; LS <br />1 $ 35,OD0.00 $ <br />1 $ 15,000.00 j $ <br />1 S ....1,000.00 1 $ ....._.1' <br />1 S 1,500M $ <br />35,000.00 <br />15,000.00 j <br />J <br />1,500.00 <br />17 <br />j 8-32 SP ; Transit Shelter with Bench EA <br />17 <br />17 <br />8-32 SP Bike Rack EA <br />L8-3251) Garbage Can EA <br />j <br />I Sub -Total $ <br />149,365.00 <br />Contingency (10%)' $ <br />14,936.50 <br />--Total <br />i <br />i <br />! $ 164,30L50 <br />I <br />i <br />j <br />1 <br />! <br />75% County Share'- Paverston e $ <br />2S%City Share -Paverstone $ <br />79,M63 <br />26,637.88 <br />j 0%County Share -Transit .. $ <br />- <br />i <br />j 100%City Share-Tran..*.. $ <br />19,250.00' <br />50%County Share -lNumination <br />$ <br />19,2W.00 <br />SO%City Share -Illumination <br />! $ <br />19,250.00-i <br />i <br />I <br />i <br />Total County Share $ <br />Total City Share $ <br />99,163.63 <br />65,137.88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.