My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-12-11-minutes-public-works-study-session
>
Meetings
>
2023
>
12. December
>
2023-12-19 10:00 AM - Commissioners' Agenda
>
2023-12-11-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2023 12:41:08 PM
Creation date
12/14/2023 12:21:22 PM
Metadata
Fields
Template:
Meeting
Date
12/19/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
112272
Type
Minutes
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />PUBLIC WORKS — BOARD OF COLTNTY COM?VIISSIONERS <br />STUDY SESSION STAFF REPORT <br />STUDY SESSION DATE: December 11, 2023 <br />TOPIC: Kittitas Highway at No. 6 Road Stop Sign <br />ACTION REQUESTED: Schedule a Public Hearing receiving the Engineer's <br />study on installation of an all -way stop at the <br />intersection of Kittitas Highway at No. 6 Road <br />LEAD STAFF: <br />Joshua Fredrickson <br />RECOMMENDATION: <br />Schedule a public hearing for receiving the County Engineer's study on the installation of <br />an all -way stop at the intersection of Kittitas Highway at No. 6 Road. <br />BRIEFING SUMMARY: <br />• Kittitas County Code 10.12.010 codifies intersection stop control <br />• 2009 Manual on Uniform Traffic Control Devices (MUTCD) 2B.06 Multi -Way <br />Stop Applications provides guidance on intersection control <br />• Recent crash data at the intersection of Kittitas Highway at No. 6 Road has <br />prompted review of the intersection for consideration of an all -way stop <br />installation <br />• Traffic data collected October 5, 2023, through October 12, 2023 at the <br />intersection <br />BACKGROUND: <br />Responding to concerns regarding the number of crashes reported at the intersection of <br />Kittitas Highway at No. 6 Road, Public Works collected traffic and speed data of the <br />intersection approaches. Public Works deployed traffic data collectors October 5, 2023, <br />and collected through October 12, 2023. Data was collected at each leg of the <br />intersection, including Kittitas Highway mile post 2.23 and 2.49, and No. 6 Road mile <br />post 0.89 and 1.15. <br />Reported crash data for the previous year was also reviewed for crashes which are <br />susceptible to correction by a multi -way stop installation. Traffic and crash data were <br />compared to guidance provided in the MUTCD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.