Laserfiche WebLink
2023 Docket Enabling Ordinance December 19, 2023 <br />Page 170 <br /> <br /> <br />12.11.01.100 Funds available from government agencies - Compliance with agency guidelines <br />required. <br /> <br />Article I. General Information <br /> <br />12.11.01.010 Acquisition generally. <br />1. Rights-of-way for Kittitas County roads are acquired generally as follows: <br />a. Dedications in accordance with applicable Kittitas County ordinances; <br />b. Donation by the landowner and acceptance by the county engineer acting for <br />the board of county commissioners; <br />c. Purchase by the county engineer acting for the board of county <br />commissioners; <br />d. Condemnation through eminent domain proceedings instituted by the board <br />of county commissioners; <br />e. Transfer from another governmental agency. <br />2. The determination of the manner of acquisition of rights-of-way is made on a project- <br />by-project basis by the board of county commissioners. <br />3. Rights-of-way for projects funded in whole or in part by federal funds, or which are <br />anticipated to be funded in whole or in part by federal funds at future stages of <br />development, as determined by the board of county commissioners, will be acquired in <br />accordance with Public Law 91-646, "Uniform Relocation Assistance and Real Property <br />Acquisition Policies Act of 1970" and RCW 8.26, "Uniform Relocation Assistance and Real <br />Property Acquisition Policies Act of 1971". (Ord. RD-40-76 (part), 1976). <br /> <br />12.11.01.020 Preliminary activities. <br />1. When a determination has been made that rights-of-way for any project will be <br />acquired in accordance with the foregoing acts, the procedures set forth in this section <br />and Sections KCC 12.12 shall be utilized. <br />2. Preliminary Activities. The county engineer shall prepare and/or obtain the following: <br />a. Right-of-way maps delineating: <br />i. Individual ownerships, <br />ii. Individual parcels of right-of-way, <br />iii. Right-of-way parcel identification numbers, <br />iv. Existing ground or road profile and designed road profile, <br />when applicable, <br />v. Private approaches marked with Permit No. or None, <br />vi. Required approach revisions together with construction <br />easement areas required, <br />vii. Drainages, and revisions together with easements required,