My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023 Docket Enabling Ordinance
>
Meetings
>
2023
>
12. December
>
2023-12-19 10:00 AM - Commissioners' Agenda
>
2023 Docket Enabling Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2023 12:18:03 PM
Creation date
12/14/2023 12:16:18 PM
Metadata
Fields
Template:
Meeting
Date
12/19/2023
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve an Ordinance for the 2023 Annual Docket Amendments to Kittitas County Code and Comprehensive Plan
Order
12
Placement
Consent Agenda
Row ID
112272
Type
Ordinance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2023 Docket Enabling Ordinance December 19, 2023 <br />Page 101 <br /> <br /> <br />developer, owner and/or designer of liability for errors or omissions in the design of <br />storm drainage facilities. <br />B. Core Element No. 2: Construction Stormwater Pollution Prevention. Prepare and maintain <br />a construction stormwater pollution prevention plan on site during the entire project and <br />amend as necessary. <br />C. Core Element No. 3: Source Control of Pollution. Apply all known, available and <br />reasonable source control BMPs. Operational and structural source control BMPs shall be <br />selected, designed and maintained according to the SWMMEW. <br />D. Core Element No. 4: Preservation of Natural Drainage Systems. Preserve natural drainage <br />systems to the extent possible at the site. <br />E. Core Element No. 5: Runoff Treatment. Projects that result in five thousand square feet or <br />more of new pollutant-generating impervious surfaces shall design, size, construct, <br />operate and maintain runoff treatment at the site. Development proposing a volume- <br />based treatment facility shall design to the SCS Type IA storm with a 6-month return <br />frequency. Development proposing a flow-rate-based treatment BMP shall design <br />facilities using Method 1 or Method 2 as described in Section 2.7.6 of the Storm Water <br />Management Manual for Eastern Washington when treatment occurs before detention. <br />When treatment will occur downstream of a detention BMP, designers shall use the 2- <br />year release rate of the detention BMP. <br /> <br />F. Core Element No. 6: Flow Control. Projects that result in ten thousand square feet or <br />more of new impervious surfaces shall design, size, construct, operate and maintain <br />stormwater flow control facilities at the site. <br />G. Core Element No. 7: Operation and Maintenance. Projects that utilize structural BMPs <br />shall prepare an operation and maintenance plan that is prepared in accordance with the <br />SWMMEW. <br />H. Core Element No. 8: Local Requirements. Projects that meet the requirements of Kittitas <br />County Road Standards will meet any optional requirements that are adopted as a part <br />of this chapter or required by Kittitas County Public Works. <br />I. Conveyance Systems. All new conveyance systems, and existing conveyance systems <br />receiving increased flow rates as a result of a project, shall be analyzed and designed to
The URL can be used to link to this page
Your browser does not support the video tag.