Laserfiche WebLink
VANTAGE HIGHWAY PAVING <br />Bids publidy opened Norember 9, 2023 10:0OAM At Kittitas County pubtic Works <br />F.d Aid fl STBGR l$l(xrzl <br />Proj*ct S RC 2296 | CRP tL7-23 <br />American Rock Products <br />s200.400-m <br />s44,200.00 <br />Eto4 oo0 (}o <br />s1.179.200.@ <br />S1,98o.oo <br />337.440.00 <br />s165.585.0C <br />s1_g(xt.oc <br />S12.o{}o-or <br />s13.200.0c <br />s25.000.fi <br />ss00.m <br />s2.004-805.0c <br />DBE %10.09%10.28la 10.00% <br />Unit orice <br />s200.400.fi <br />s52.00 <br />33.8C <br />588.oa <br />s0.20 <br />So.26 <br />s155.585.00 <br />s190.o0 <br />s12.fi)O.O0 <br />s1_100_oo <br />ss,000.00 <br />s2s.000.00 <br />ss00.00 <br />Grcnite <br />Total <br />s170.000.00 <br />s42.075.00 <br />s160.(m.o0 <br />S1,2oo,om.oo <br />s18.Om.00 <br />s1,935.00 <br />s36,000.00 <br />s150,4m.00 <br />s7.500.0c <br />Slo.ooo.oo <br />SrS.ooo.oo <br />s5-fi)o.00 <br />325.om.oc <br />s1.000.oc <br />s1,857,910.0C <br />Unit price <br />s49.sC <br />s75O.00 <br />E10.ffn (|n <br />S1.2so.oo <br />Ss.ooo.oo <br />25.000.00 <br />1.fi)O.O0 <br />Central Pavin( <br />fotel <br />s190.m0.00 <br />s34.(x)o.oo <br />s242.400.0O <br />s1,433,800.00 <br />s43.200.00 <br />s205,750.00 <br />s2.500.00 <br />s16.O77.0t <br />s12.OOO.Oe <br />ss,000.0c <br />s25.000.0c <br />s500.0c <br />s2.226.247.N <br />unit Drice <br />s190.000.00 <br />s40.00 <br />s3.03 <br />s107.00 <br />so.2o <br />So.3o <br />s20s,750.00 <br />s250.00 <br />s16.077.00 <br />s1.000.oo <br />5s,00o.oo <br />s25,000.00 <br />ss00.00 <br />EnElneer Estlmate <br />fotal <br />s263,60s.( <br />s29,750.00 <br />s262.400.00 <br />s2,010,000.00 <br />S14.4oo.oo <br />s900.00 <br />541.760-oo <br />s20o,0o0.0c <br />s1.725.0C <br />s15.000.0c <br />530.000.0c <br />s5.000.oc <br />s2s.000.oc <br />s1.000.oc <br />s7?4.47A.n <br />s3,135,018.s0 <br />Unit price <br />s253,60s.00 <br />s3s.m <br />s3.28 <br />s1s0.00 <br />so.20 <br />s100.0( <br />s0.29 <br />s200,000.0c <br />st72.5C <br />s1s,m0.0c <br />s2,s00.0c <br />s5.m0.0c <br />s25.OOO.0C <br />s1.000.0c <br />mL70% <br />Descrlotlon <br />MOBILZANON <br />CRUSHED SURFACING BASE COURST <br />PTANING BITUMINOUS PAVEMENT <br />HMA CL. v2 rN. PG 64-28H <br />TEMPORARY PAVEMENT MARKING-5HORT DURATION <br />PROJECT TEMPORARY TRAFFIC CONTROT <br />EsC LEAD <br />ROADSIDE SURVEYING <br />REMOVING AND RESETTING MONUMENT CASE AND COVER <br />ROADSIDE C[EANUP <br />MINOR CHANGE <br />SPCC PLAN <br />Unlt <br />ts <br />TON <br />SY <br />TON <br />tF <br />t5 <br />DAY <br />LS <br />EACH <br />EST <br />EST <br />Ls <br />Quandtv <br />1 <br />850 <br />8flX10 <br />13400 <br />!r4000 <br />1 <br />10 <br />7 <br />t2 <br />Bld ltem <br />7 <br />2 <br />3 <br />4 <br />? <br />8 <br />I <br />10 <br />L7 <br />12 <br />13 <br />t4